Full Calendar - Drag and drop between days in day view - fullcalendar

I searched all the previously posted questions and was not able to find anything about how to drag and drop an event to the previous day (drag left) or next day (drag right) within day view. This is how Google calendar works and I was hoping to have the same ability. Is this possible?

Related

FullCalendar.js event/render to date within a cell

I am trying to find out how to disable the date click within a cell while in the month view. I cannot find it in the documentation on the site. I only see dayRender and disabling the entire cell. I just need the date itself not the cell. I needed selectable to be true for the calendar just not this piece.
Is there a event/render that I can get to in full calendar to stop this from going to the day view? Thanks for any help that is provided.

How to jump to a specific date on fullcalendar?

I've created a page where all the booked appointments showing in a table with four buttons for each one, show on calendar, edit, delete and not_accepted .
The edit, delete and not_accepted buttons i can handle them very easily, but i don't know how to show the clicked event on the calendar which exist under the table, lets imagine that i clicked show on calendar on one of the booked appointments the page will be scrolled down a little bit and the calendar should took me to the event, so its similar to a slider but i don't have to click next to see where is the event exist by date for example .
I am feeling that jsEvent coordinates would help some how !!, but really don't know how to do it .
Please any help .

Want to Display 3 months at a time in FullCalendar (adam Shaw)

I want to be able to view 3 large months at a time using FullCalendar by Adam Shaw in my WP site. Possible? In other words, current month, plus two more. A 90 day events Calendar starting with the if the current date falls in a given month. Example, today is July 26, so display July, Aug, Sept.
Any ideas? I am calling it for use in a WP Events manager application.
Thanks,
Create three FullCalendar instances next to each other:
Set the defaultView for all three to 'month'.
Disable the previous and next buttons for two of the three calendar instances by manipulating their headers.
Disable any other views (like agendaDay, agendaWeek, etc.) in all calendar headers.
Whenever the viewDisplay callback is called on the calendar with the previous and next buttons, update the other calendar's date using gotoDate.
If you also need to use a week and/or day view, you may wish to set them up in a similar way, although I can imagine that would be confusing. You could also hide (using CSS) two of the three calendars when the user navigates to day or week view, and make them reappear when the user selects month view again. You probably need some CSS hocus pocus anyway to make it all look slick, but I think it should be doable.

FullCalendar View More Button moving

I have added a hack/add-on to allow me to limit the number of events which can appear on the Full Calendar plugin. This is where I have got the code from. https://github.com/lyconic/fullcalendar/tree/view-more
However, whenever I change the month or day the view more button moves and is hidden behind an event. Its really annoying and I don't know how to fix it.
Any advice?

Display calendar control with week number and capture week number when user selects and display in textbox

I am using a Ajax calendar control to pop up calendar from text box, want to display the week number in the calendar control itself, after user selects a week in the week mode (SelectionMode="DayWeek"), would like to display that week number in the text box. Preferably looking to implement using asp.net calendar control not jQuery.
Appreciate any assistance.
Thanks
Thought not to use the jquery, due to the ease and so many folks having solution out there i found the solution.
http://jsbin.com/eliki/16/
one of the issue is the the SQL server week (mostly in US) starts from Sunday, but iso8601Week starts from Monday, I did work around this by placing the weekend towards the end and disabling. Let me know what you think of the solution or have better solution out there.
http://jsbin.com/eliki/16/
Ujjwal

Resources