I can see in Legacy Visualisation in Cognos have a Gantt chart option. I tried to create but it is not working. I have Planned start date and end date and Actual Start date and end date. How can I create a Gantt chart in IBM Cognos Analytics 11.1 R6.
Related
The title says it all really,
I'm trying to create a program where the weekends are working day however we still want to see when the weekends are so having them shaded/a different colour would be helpful.
is this possible?
Thanks
Presuming you're in a Gantt or Team Planner view, open the Timescale editor**, select the Non-working time tab and choose in the Calendar drop-down a calendar that has weekends set as non working time.
I'd wager that you edited the Standard (Project Calendar) to make weekends workable; if that's the case, a new calendar will need to be created that keeps weekends set to non-working time. This new calendar is what you would set your Timescale > Non-working Time to display.
**right-click the top area of the Gantt chart where the dates are, click Timescale
There is the possibility to select a google combo chart in the new iccube 6 reporting. But I am not able to add one bar chart with a line series.
Has anybody got this working?
AmChart`s graph configurations
You can use any number of graph configurations you want, and each of it may have it's on type defined in graph configuration's advanced settings.
Take a look at the Demo Report.
I'm building a website which records every order from user. I want to construct graphs such as pie chart, bar chart and etc... to display data. How can I do this in phoenix framework? any suggestions?
Phoenix is not what you're looking for. You want a graphics library like d3.js that allows the drawing of charts and data visualization in webpages.
I have created a custom report in GA with metric group as Users and dimension as date.I sent this report in PDF format to my email id using "once" as frequency of the mail in "email report" window.
As expected ,in this report I get a chart where X axis represents dates and Y represents no of users on that date.
When I schedule this mail and use daily as frequency ,I get the email correctly ,but the dimension of the chart is shown as year and I no longer see dates across X axis.
So on X axis its as 2009 ,2010 and so on.Y axis is shown correct.
I am not sure why does this happen in case of scheduled reports only.I am using universal Analytics here.
Any inputs would be highly appreciated!thanks.
This is because on the daily report, only the data for the day that the email report is sent to you is included. If you look at the daily report, in the upper right corner, is the date range just one day? Unfortunately, there really isn't a "fix" for this issue, but there is a workaround which was mentioned in this Google forum, which you can try out: https://productforums.google.com/forum/#!topic/analytics/4iNe_6oeZ2c
Hope this helps.
Yes, it doesn't work as expected.
When I set up my reports, I had the same issue.
The "fix" as described in the in the google forum below doesn't exactly solve the issue either.
Shameless plug:
So I built my own at http://mysitevitals.com
It's a basic dashboard that pulls down your GA data and then uses Google Charts API to make 30 day rolling charts and then sends you the email every morning.
Is it possible to create a pie chart report in AX 2009 Standard reports?
As I know, the answer is 'No', but you can:
Add pie chart to form as ActiveX
Use SSRS (or any other reporting tool you like)
Generate pie chart bitmap (with helps some external program) and insert this bitmap on your report