I am running a CART decision tree on a training set which I've tokenized using quanteda for a routine text analysis task. The resulting DFM from tokenizing was turned into a dataframe and appended with the class attribute I am predicting for.
Like many DFMs, the table is very wide (33k columns), but only contains about 5,500 rows of documents. Calling rpart on my training set returns a stack overflow error.
If it matters, to help increase the speed of calculations, I am using the doSNOW library so I can run the model on 3 out of 4 of my cores in parallel.
I've looked at this answer but can't figure out how to do the equivalent on my mac workstation to see if the same solution would work for me. There is a chance that even if I increase the ppsize of RStudio, I may still run into this error.
So my question is how do I increase the maxppsize of RStudio on a mac, or more generally, how can I fix this stack overflow so I can run my model?
Thanks!

In the end, I found that macs don't have this same command line option since the mac version of RStudio uses all available memory by default.
So the way I fixed this is by decreasing the complexity of the task by reducing the sparsity. I cleaned the document-term matrix by removing all tokens that did not occur in at least 5% of the corpus. This was enough to take a matrix with 33k columns down to a much more manageable 3k columns while still leading to a highly representative DFM.

Related

Parallel computing in R, due to space issues

I am stuck with huge dataset to be imported in R and then processing it (by randomForest). Basically, I have a csv file of about 100K rows and 6K columns. Importing it directly takes a long time with many warnings regarding space allocations (limit reached for 8061mb). At the end of many warnings, I do get that dataframe in R, but not sure whether to rely on it. Even if I use that dataframe, I am pretty sure running a randomForest on it will definitely be a huge problem. Hence, mine is a two part question:
How to efficiently import such a large csv file without any warnings/errors?
Once imported into R, how to proceed for using randomForest function on it.
Should we use some package which enhances computing efficiency. Any help is welcome, thanks.
Actually your limit for loading files in R seems to be 8G, try increasing that if your machine have more memory.
If that does not work, one option is that you can submit to MapReduce from R ( see http://www.r-bloggers.com/mapreduce-with-r-on-hadoop-and-amazon-emr/ and https://spark.apache.org/docs/1.5.1/sparkr.html). However, Random Forest is not supported in either way yet.

Fastest way to reduce dimensionality for multi-classification in R

What I currently have:
I have a data frame with one column of factors called "Class" which contains 160 different classes. I have 1200 variables, each one being an integer and no individual cell exceeding the value of 1000 (if that helps). About 1/4 of the cells are the number zero. The total dataset contains 60,000 rows. I have already used the nearZeroVar function, and the findCorrelation function to get it down to this number of variables. In my particular dataset some individual variables may appear unimportant by themselves, but are likely to be predictive when combined with two other variables.
What I have tried:
First I tried just creating a random forest model then planned on using the varimp property to filter out the useless stuff, gave up after letting it run for days. Then I tried using fscaret, but that ran overnight on a 8-core machine with 64GB of RAM (same as the previous attempt) and didn't finish. Then I tried:
Feature Selection using Genetic Algorithms That ran overnight and didn't finish either. I was trying to make principal component analysis work, but for some reason couldn't. I have never been able to successfully do PCA within Caret which could be my problem and solution here. I can follow all the "toy" demo examples on the web, but I still think I am missing something in my case.
What I need:
I need some way to quickly reduce the dimensionality of my dataset so I can make it usable for creating a model. Maybe a good place to start would be an example of using PCA with a dataset like mine using Caret. Of course, I'm happy to hear any other ideas that might get me out of the quicksand I am in right now.
I have done only some toy examples too.
Still, here are some ideas that do not fit into a comment.
All your attributes seem to be numeric. Maybe running the Naive Bayes algorithm on your dataset will gives some reasonable classifications? Then, all attributes are assumed to be independent from each other, but experience shows / many scholars say that NaiveBayes results are often still useful, despite strong assumptions?
If you absolutely MUST do attribute selection .e.g as part of an assignment:
Did you try to process your dataset with the free GUI-based data-mining tool Weka? There is an "attribute selection" tab where you have several algorithms (or algorithm-combinations) for removing irrelevant attributes at your disposal. That is an art, and the results are not so easy to interpret, though.
Read this pdf as an introduction and see this video for a walk-through and an introduction to the theoretical approach.
The videos assume familiarity with Weka, but maybe it still helps.
There is an RWeka interface but it's a bit laborious to install, so working with the Weka GUI might be easier.

How can I tell if R is still estimating my SVM model or has crashed?

I am using the library e1071. In particular, I'm using the svm function. My dataset has 270 fields and 800,000 rows. I've been running this program for 24+ hours now, and I have no idea if it's hung or still running properly. The command I issued was:
svmmodel <- svm(V260 ~ ., data=traindata);
I'm using windows, and using the task manager, the status of Rgui.exe is "Not Responding". Did R crash already? Are there any other tips / tricks to better gauge to see what's happening inside R or the SVM learning process?
If it helps, here are some additional things I noticed using resource monitor (in windows):
CPU usage is at 13% (stable)
Number of threads is at 3 (stable)
Memory usage is at 10,505.9 MB +/- 1 MB (fluctuates)
As I'm writing this thread, I also see "similar questions" and am clicking on them. It seems that SVM training is quadratic or cubic. But still, after 24+ hours, if it's reasonable to wait, I will wait, but if not, I will have to eliminate SVM as a viable predictive model.
As mentioned in the answer to this question, "SVM training can be arbitrary long" depending on the parameters selected.
If I remember correctly from my ML class, running time is roughly proportional to the square of the number training examples, so for 800k examples you probably do not want to wait.
Also, as an anecdote, I once ran e1071 in R for more than two days on a smaller data set than yours. It eventually completed, but the training took too long for my needs.
Keep in mind that most ML algorithms, including SVM, will usually not achieve the desired result out of the box. Therefore, when you are thinking about how fast you need it to run, keep in mind that you will have to pay the running time every time you tweak a tuning parameter.
Of course you can reduce this running time by sampling down to a smaller training set, with the understanding that you will be learning from less data.
By default the function "svm" from e1071 uses radial basis kernel which makes svm induction computationally expensive. You might want to consider using a linear kernel (argument kernel="linear") or use a specialized library like LiblineaR built for large datasets. But your dataset is really large and if linear kernel does not do the trick then as suggested by others you can use a subset of your data to generate the model.

R becomes unresponsive while running randomforest on huge data. Does this mean it is still running or it has stopped working?

My data contains 229907 rows and 200 columns. I am training randomforest on it. I know it will take time. But do not know how much. While running randomforest on this data, R becomes unresponsive. "R Console (64 Bit) (Not Responding)". I just want to know what does it mean? Is R still working or it has stopped working and I should close it and start again?
It's common for RGui to be unresponsive during a long calculation. If you wait long enough, it will usually come back.
The running time won't scale linearly with your data size. With the default parameters, more data means both more observations to process and more nodes per tree. Try building some small forests with ntree=1, different values of the maxnodes parameter and different amounts of data, to get a feel for how long it should take. Have the Windows task manager or similar open at the same time so that you can monitor CPU and RAM usage.
Another thing you can try is making some small forests (small values of ntree) and then using the combine function to make a big forest.
You should check your CPU usage and memory usage. If the CPU is still showing a high usage with the R process, R is probably still going strong.
Consider switching to R 32 bit. For some reason, it seems more stable for me - even when my system is perfectly capable of 64 bit support.

Large matrix: solve(crossprod(X)) when dim(X) = 100,000:5000

I need to do run a simple two-stage least squares regression on large data matrices. This just requires some crossprod() and solve() commands, but the matrices have dimensions 100,000 by 5000 matrix. My understanding is that holding a matrix like this in memory would take up a bit less than 4GB of memory. Unfortunately, my 64-bit Win7 machine only has 8GB of RAM. When I try to manipulate the matrices in question, I get the usual 'can't allocate vector of size' message.
I have considered a number of options such as the ff and bigmemory packages. However, the base R functions for the matrix operations I need only support the usual matrix object type, not the bigmatrix type.
It seems like it may be possible to extend the code from biglm(), but I'm on a tight schedule for this project, so I wanted to check-in with you all to see if there existed a ready-made solution for problems like this. Apologies if this was addressed before (I couldn't find it) or if the question is too generic.
Yes, a ready-made solution exist in biglm, the package you already identified. Linear regression can work with an updating scheme; that basic property is implemented in the package.
Dump your data to disk, say to SQLite and study the package documentation and proceed in, say, 10 chunks on 10,000 each.