Hello Stack Overflow Community,
I'm attempting to solve this problem:
https://uva.onlinejudge.org/index.php?option=com_onlinejudge&Itemid=8&page=show_problem&problem=1040
The problem is to find the best path based on capacity between edges. I get that this can be solved using Dynamic Programming, I'm confused by the example they provide:
According to the problem description, if someone is trying to get 99 people from city 1 to 7, the route should be 1-2-4-7 which I get since the weight of each edge represents the maximum amount of passengers that can go at once. What I don't get is that the description says that it takes at least 5 trips. Where does the 5 come from? 1-2-4-7 is 3 hops, If I take this trip I calculate 4 trips, since 25 is the most limited hop in the route, I would say you need 99/25 or at least 4 trips. Is this a typo, or am I missing something?
Given the first line of the problem statement:
Mr. G. works as a tourist guide.
It is likely that Mr. G must always be present on the bus, thus the equation for the number of trips is:
x = (ceil(x) + number_of_passengers) / best_route
rather than simply:
x = number_of_passengers / best_route
or, for your numbers:
x = (ceil(x) + 99) / 25
Which can be solved with:
x == 4.16 (trips)
Related
I'm practicing for my entrance exam. There are some sample tests available for candidates and I want to solve them before appearing for the exam. But facing problem with the following question.
If anyone can help me solve this, would be highly appreciated.
There are 15 main cities in one country. Some of them are connected by roads.
Besides,
a) You can get from each one city to any other one by a single route;
b) There is only one city with 2 outgoing roads. The other cities have either
1 or 3 outgoing roads.
What is the number of cities with one outgoing road?
Thanks in advance.
Because of a) we can say that this is a tree structure. And in trees the number of edges are one less than number of nodes. Therefore there are only 14 roads. If the number of cities with one outgoing road is x, then 1 * x + 2 * 1 + 3 * (14 - x) = 2 * 14 Which gives us x = 8.
Given N integers in the form of Ai where 1≤i≤N, the goal is to find the M that minimizes the sum of |M-Ai| and then report that sum.
For example,
Sample Input: 1 2 4 5
Sample Output: 6
Explanation: One of the best M′s you could choose in this case is 3.
So the answer = |1−3|+|2−3|+|4−3|+|5−3| = 6.
The approach I used is sort the given input and take the middle number as M.
But I was not able to solve all the test cases. I am unable to find any other approach for this question. Where did I go wrong?(Please help me this question has been bugging me from the past 2 days.Thanks)
Can M be any real number or must it be an integer?
If there are no constraints on M your algorithm must work fine.
If M must be an integer then you have to choose M among floor(The Middle Number) and ceiling(The Middle Number).
In which language did you code up the algorithm?
I have tried to use the R package LPSolve and in particular the lp.transport function to solve a optimisation problem. In my fictitious example below I have 5 office sites that I need to resource with a minimum number of employees and I have set up a cost matrix that determines the distance from each employees home to the office. I want to minimize the total distance traveled to work whilst meeting the minimum number of employees per office.
Initially this was working as I was treating all employees as equal (1). however problems have started to occur when I rate each employee by how efficient they are. For example I now want to say that officeX needs the equivalent of 2 engineers which might be made up of 4 engineers who are 50% efficient or 1 that is 200% efficient. When I do this however the solution found will split a employee across a number of offices, what I need is a additional constraint so impose that a employee can only be at 1 Office.
Anyway hopefully that is enough background here is my example:
Employee <- c("Jim","John","Jonah","James","Jeremy","Jorge")
Office1 <- c(2.58321505105556, 5.13811249390279, 2.75943834864996,
6.73543614029559, 6.23080251653027, 9.00620341764497)
Office2 <- c(24.1757667923894, 19.9990724784926, 24.3538456922105,
27.9532073293925, 26.3310994833106, 14.6856664813007)
Office3 <- c(38.6957155251069, 37.9074293509861, 38.8271000719858,
40.3882569566947, 42.6658938732098, 34.2011184027657)
Office4 <- c(28.8754359274453, 30.396841941228, 28.9595182970988,
29.2042274337124, 33.3933900645023, 28.6340025144932)
Office5 <- c(49.8854888720157, 51.9164328512659, 49.948290261029,
49.4793138594302, 54.4908258333456, 50.1487397648236)
#create CostMatrix
costMat<-data.frame(Employee,Office1, Office2, Office3, Office4, Office5)
#efficiency is the worth of employees, eg if 1 they are working at 100%
#so if for example I wanted 5 Employees
#working in a office then I could choose 5 at 100% or 10 working at 50% etc...
efficiency<-c(0.8416298, 0.8207991, 0.7129663, 1.1406839, 1.3868177, 1.1989748)
#Uncomment next line to see the working version based on headcount
#efficiency<-c(1,1,1,1,1,1)
#Minimum is the minimum number of Employees we want in each office
minimum<-c(1, 1, 2, 1, 1)
#solve problem
opSol <-lp.transport(cost.mat = as.matrix(costMat[,-1]),
direction = "min",
col.signs = rep(">=",length(minimum)),
col.rhs = minimum,
row.signs = rep("==", length(efficiency)),
row.rhs = efficiency,
integers=NULL)
#view solution
opSol$solution
# My issue is one employee is being spread across multiple areas,
#what I really want is a extra constraint that says that in a row there
# can only be 1 non 0 value.
I think this is no longer a transportation problem. However you still can solve it as a MIP model:
I am not good at probability and I know it's not a coding problem directly. But I wish you would help me with this. While I was solving a computation problem I found this difficulty:
Problem definition:
The Little Elephant from the Zoo of Lviv is going to the Birthday
Party of the Big Hippo tomorrow. Now he wants to prepare a gift for
the Big Hippo. He has N balloons, numbered from 1 to N. The i-th
balloon has the color Ci and it costs Pi dollars. The gift for the Big
Hippo will be any subset (chosen randomly, possibly empty) of the
balloons such that the number of different colors in that subset is at
least M. Help Little Elephant to find the expected cost of the gift.
Input
The first line of the input contains a single integer T - the number
of test cases. T test cases follow. The first line of each test case
contains a pair of integers N and M. The next N lines contain N pairs
of integers Ci and Pi, one pair per line.
Output
In T lines print T real numbers - the answers for the corresponding test cases. Your answer will considered correct if it has at most 10^-6 absolute or relative error.
Example
Input:
2
2 2
1 4
2 7
2 1
1 4
2 7
Output:
11.000000000
7.333333333
So, Here I don't understand why the expected cost of the gift for the second case is 7.333333333, because the expected cost equals Summation[xP(x)] and according to this formula it should be 33/2?
Yes, it is a codechef question. But, I am not asking for the solution or the algorithm( because if I take the algo from other than it would not increase my coding potentiality). I just don't understand their example. And hence, I am not being able to start thinking about the algo.
Please help. Thanks in advance!
There are three possible choices, 1, 2, 1+2, with costs 4, 7 and 11. Each is equally likely, so the expected cost is (4 + 7 + 11) / 3 = 22 / 3 = 7.33333.
So, this is a bit different than standard fantasy football. What I have is a list of players, their average "points per game" (PPG) and their salary. I want to maximize points per game under the constraint that my team does not exceed a salary cap. A team consists of 1 QB, 1 TE, 3 WRs, and 2 RBs. So, if we have 15 of each position we have 15X15 X(15 c 3)X(15 c 2) = 10749375 possible teams.
Pretty computationally complex. I can use a bit of branch and bound i.e. once a team has surpassed the salary cap I can trim the tree, but even with that the algorithm is still pretty slow. I tried another option where I used a "genetic algorithm" i.e. made 10 random teams, picked the best one and "mutated" it (randomly changing some of the players) into another 10 teams and then picked of those and then looped through a bunch of times until the points per game of the "best team" stopped getting better.
There must be a better way to do this. I'm not a computer scientist and I've only taken an intro course in algorithmics. Programmers - what are your thoughts? I have a feeling that some sort of application of dynamic programming could help.
Thanks
I think a genetic algorithm, intelligently implemented, will yield an acceptable result for you. You might want to use a metric like points per salary dollar rather than straight PPG to decide the best team. This way you are inherently measuring value added. Also, you should consider running the full algorithm/mutation to satisfactory completion numerous times so that you can identity what players consistently show up in the final outcomes. These players then should be valued above others.
Of course the problem with the genetc approach Is that you need a good mutation algorithm and that is highly personal for how you want to implement it.
Take i as the current number of players out of n players and j to be the current remaining salary that is left. Take m[i, j] to be the dynamic set of solutions.
Then m[i, 0] = 0, m[0, j] = 0
and
m[i, j] = m[i - 1, j] if salary for player i is greater than j
else
m[i, j] = max ( m[i - 1, j], m[i - 1, j - salary of player i] + PPG of player i)
Sorry that I don't know R but I'm good with algorithms so I hope this helps.
A further optimization you can make is that you really only need 2 rows of m[i, j] because the DP solution only uses the current row and the last row (you can save memory this way)
First of all, the variation you have provided should not be right. Best way to build team is limit positions by limited plus there is absolutely no sense of moving 3 similar positions players between themselves.
Christian Ronaldo, Suarez and Messi will give you the equal sum of fantasy points in any line-up, like:
Christian Ronaldo, Suarez and Messi
or
Suarez, Christian Ronaldo and Messi
or
Messi, Suarez, Ronaldo
First step - simplify the variation possibility.
Next step - calculate the average price, and build the team one by one by adding player with lower salary but higher price. When reach salary limit, remove expensive one and add cheaper but with same fantasy points - and so on. Don't build the variation, value the weight of each player by combination of salary and fantasy points.
Does this help? It sets up the constraints and maximises points.
You could adapt to get data out of excel
http://pena.lt/y/2014/07/24/mathematically-optimising-fantasy-football-teams