TimePicker - Time is not selected properly - javafx

When i try to select a time (3:15 as example) on the display it is mostly one minute beside the actual desired time. Mostly - sometimes it is selecting properly but i didn't find out when. Is it a known bug? Do i have to set a range or something. Thanks for any help.

Related

Render events for one year displaying a date range of 40 days in ResourceTimeline

I am in the process to add FullCalendar v4 to our react application and I'm pretty new to FullCalendar, so excuse me if I ask a basic question.
I searched both the documentation and StackOverflow, but couldn't find any hints to my current problem. Let me briefly describe our goal scenario:
We want to load and render the events for a whole year and show a date range of about 40 days (a whole month and additionally 5 days from the last and the next month) to the user. The user should be able to scroll through the whole year with the scrollbar.
The first question is whether FC4 already provides the functionality with which we can achieve our goal. I tried to define a custom view of type 'resourceTimeline' with a duration of 30 days and additionally set the 'validRange' to the current year. This gives me the look I want, but unfortunately it is static - the scrollbar is not visible as long as the screen can display the whole area of 40 days. With the next/previous buttons I can switch between the 40 days segments, but I'd rather use these buttons to switch between years and use the scrollbar to scroll within the year.
We have now tried to set the 'visibleRange' to the current year and programmatically scroll to the current date in the 'datesRender' function. The problem is that we can't decide whether FC4 was initially loaded (where we would scroll to the current date) or whether a user scrolled manually to another date in the timeline and edited an event there. In this case the scroll position should be kept.
So what we are missing is the matching callback that tells us that the 'executeRender' function has been completely executed. The question at this point is how and where I can provide an application specific callback function that is triggered after all dates and events have been rendered. I also saw several internal success callbacks. Is it possible to overwrite them?
Any ideas and hints are highly appreciated.
Thank you very much for thinking along.

Updating an Apple Watch's complication's content at midnight

I've add my complication entries and this all seems to work well - each complication entry is scheduled for midnight.
I'm testing the time change by setting my Mac's date to the following day where I'm expecting my complication to update to the next entry.
However, it only updates the entry when I open and close my app. I'm expecting to see it automatically change like the other standard complications do. Is this some behaviour I need to go out of my way to implement? I'd expect an automatic change as per the docs.
I've found the following:
ClockKit begins displaying a timeline entry precisely at the time specified by the entry’s date property.
But surely this is a greater than check too? I tried setting it exactly to midnight but (surprisingly) this doesn't work either.
Any help is appreciated.
Additionally, I found the following regarding updating the timeline, but I would have thought this would be for changing the timeline entries as oppose to just refreshing the complication for the current timeline:
During a background app refresh task. You can schedule background tasks to periodically update your watchOS content. This works best when your data changes at predictable times.
The Watch Simulator appears to have some quirks around handling of times. In particular, it doesn’t seem to obey time changes on the underlying system until you relaunch it.
Relaunch the Simulator after changing the system clock and check on your Complication then. If you want to test the transition to the next day specifically, you can set the system time to 11:58 pm and wait for it to cut over.

Resize option for Selected Dates across multiple months in FullCalendar

I just started using Full Calendar 4. Its awesome.
All things working great.
I am including a functionality to resize already selected dates across multiple months. For example, I select dates in April, and I want to continue my selection to 10th of May, But I think currently it is not possible.
I am trying to make it work like:
Click on next month, save current selected dates, by holding Ctrl or Shift keys, click on other dates and adding those dates to previous selected dates.
I went through new feature requests and issues, but this exact feature did not listed there.
Just curious to ask that if any other possible work around to this functionality or am I doing it right?

FullCalendar: Month View: Set a minimum size for each day--even if empty

Loving fullCalendar.
I have a need to show every day in the month (even if there are no events) with 6 blank lines. Giving me, if needed, a blank calendar that has enough space in each day that when I print it and give to our volunteers, they can write in each cell.
Thank you. Your tip sent me in the right direction.
I have variables giving the reader the ability to choose their own lineheight, font size, # of lines, etc. I needed to give them the ability to set the HEIGHT parameter as well. It all works perfectly now. Thank you!

How can I make days wrap around in a QDateEdit?

The standard behaviour is, that as soon as the day reaches 31 the step-up button stops working. I'd like it to reset to 1 and jump to the next month.
I have not had the opportunity to test this, but I know that QDateEdit implements QAbstractSpinBox, so you should be able to call
myDateEdit.setWrapping(True)
which should accomplish what you want.
Doc Link
Update:
The term for this behaviour is apparently called "rollover" and here is one person's implementation, which (again, I haven't tested it) appears to be another potential solution:
Rollover QDateEdit
He makes the point that his implementation doesn't consider min or max dates though.

Resources