R - Running multiple scripts in parallel - r

here is my problem:
I have 3 R scripts which take a lot of time to run. These scripts run each different data. I would like to run them in parallel. One solution is to run them in 3 different R sessions or 3 different projects as mentionned here or in 3 different batch. The problem is that I need to gather the data returned by these 3 scripts once they have run and complete the rest of computation in a fourth script that takes a lot of time as well. It would need to be done under Windows.
Is it possible to run these 3 scripts in parallel and return the ouput in one workspace to complete the computation with the fourth automatically? If yes, how?
Let's suppose that the answer to question 1 is yes. The fourth script output 3 variables. Is it possible to use them as input to the 3 scripts and loop until a condition in the 4th script is verified?
As an example you can assume the following scripts:
Script1.R
Sys.sleep(10)
a <- 3
Script2.R
Sys.sleep(10)
b <- 5
Script3.R
Sys.sleep(10)
c <- 56
In reality my scripts take 1 hour each to run. I would need to run the 3 above scripts in parallel, retrieve the 3 outputs a,b and c in the same workspace to continue the computation. So instead of having to wait 10 seconds for each scripts to compute I would wait only 10 seconds for the 3 scripts to compute. Alternatively you can take any 3 scripts of your choice that takes a lot of time to compute.
Thank you.

Related

How to continue running an R script after a 1 hour pause

I'm downloading some kind of data from a webserver which limites the number of queries to 100 per hour.
Do you know an effective way to insert a time lag between r-script code lines to automatically run the script and gather the data after (approx.) 10 hours?
Many thanks in advance!

How to create an empty loop that runs for a given time in R

I need create an empty loop that runs for a given time, for example 2 hours. The loop just runs for nothing, no matter what it does, it is important that it loads R executions for exactly 2 hours.
for example, let's have some kind of script
model=lm(Sepal.Length~Sepal.Width,data=iris)
after this row there is an empty loop that does something for exactly 2 hours
for i....
after the empty loop has completed via 2 hours, continue to execute subsequent rows
summary(model)
predict(model,iris)
(no matter what row, it is important that in a certain place of code the loop wasted for 2 hours)
How it can be done?
Thanks for your help.
There is no need to do this using a loop.
You can simply suspend all execution for n seconds by using Sys.sleep(n). So to suspend for 2 hours you can use Sys.sleep(2*60*60)

R Parallel Processing - Node Choice

I am attempting to process a large amount of data in R on Windows using the parallel package on a computer with 8 cores. I have a large data.frame that I need to process row-by-row. For each row, I can estimate how long it will take for that row to be processed and this can vary wildly from 10 seconds to 4 hours per row.
I don't want to run the entire program at once under the clusterApplyLB function (I know this is probably the most optimal method) because if it hits an error, then my entire set of results might be lost. My first attempt to run my program involved breaking it up into Blocks and then running each Block individually in parallel, saving the output from that parallel run and then moving on to the next Block.
The problem is that as it ran through the rows, rather than running at 7x "real" time (I have 8 cores, but I wanted to keep one spare), it only seems to be running at about 2x. I've guessed that this is because the allocation of rows to each core is inefficient.
For example, ten rows of data with 2 cores, two of the rows could run in 4 hours and the other two will take 10 seconds. Theoretically this could take 4 hours and 10 seconds to run but if allocated inefficiently, it could take 8 hours. (Obviously this is an exaggeration, but a similar situation can happen when estimates are incorrect with more cores and more rows)
If I estimate these times and submit them to the clusterApplyLB in what I estimate to be the correct order (to get the estimated times to be spread across cores to minimize time taken), they might not be sent to the cores that I want them to be, because they might not finish in the time that I estimate them to. For example, I estimate two processes to have times of 10 minutes and 12 minutes and they take 11.6 minutes and 11.4 seconds then the order that the rows are submitted to clusterApplyLB won't be what I anticipated. This kind of error might seem small, but if I have optimised multiple long-time rows, then this mix-up of order could cause two 4-hour rows to go to the same node rather than to different nodes (which could almost double my total time).
TL;DR. My question: Is there a way to tell an R parallel processing function (e.g. clusterApplyLB, clusterApply, parApply, or any sapply, lapply or foreach variants) which rows should be sent to which core/node? Even without the situation I find myself in, I think this would be a very useful and interesting thing to provide information on.
I would say there are 2 different possible solution approaches to your problem.
The first one is a static optimization of the job-to-node mapping according to the expected per-job computation time. You would assign each job (i.e., row of your dataframe) a node before starting the calculation. Code for a possible implementation of this is given below.
The second solution is dynamic and you would have to make your own load balancer based on the code given in clusterApplyLB. You would start out the same as in the first approach, but as soon as a job is done, you would have to recalculate the optimal job-to-node mapping. Depending on your problem, this may add significant overhead due to the constant re-optimization that takes place. I think that as long as you do not have a bias in your expected computation times, it's not necessary to go this way.
Here the code for the first solution approach:
library(parallel)
#set seed for reproducible example
set.seed(1234)
#let's say you have 100 calculations (i.e., rows)
#each of them takes between 0 and 1 second computation time
expected_job_length=runif(100)
#this is your data
#real_job_length is unknown but we use it in the mock-up function below
df=data.frame(job_id=seq_along(expected_job_length),
expected_job_length=expected_job_length,
#real_job_length=expected_job_length + some noise
real_job_length=expected_job_length+
runif(length(expected_job_length),-0.05,0.05))
#we might have a negative real_job_length; fix that
df=within(df,real_job_length[real_job_length<0]<-
real_job_length[real_job_length<0]+0.05)
#detectCores() gives in my case 4
cluster_size=4
Prepare the job-to-node mapping optimization:
#x will give the node_id (between 1 and cluster_size) for each job
total_time=function(x,expected_job_length) {
#in the calculation below, x will be a vector of reals
#we have to translate it into integers in order to use it as index vector
x=as.integer(round(x))
#return max of sum of node-binned expected job lengths
max(sapply(split(expected_job_length,x),sum))
}
#now optimize the distribution of jobs amongst the nodes
#Genetic algorithm might be better for the optimization
#but Differential Evolution is good for now
library(DEoptim)
#pick large differential weighting factor (F) ...
#... to get out of local minimas due to rounding
res=DEoptim(fn=total_time,
lower=rep(1,nrow(df)),
upper=rep(cluster_size,nrow(df)),
expected_job_length=expected_job_length,
control=DEoptim.control(CR=0.85,F=1.5,trace=FALSE))
#wait for a minute or two ...
#inspect optimal solution
time_per_node=sapply(split(expected_job_length,
unname(round(res$optim$bestmem))),sum)
time_per_node
# 1 2 3 4
#10.91765 10.94893 10.94069 10.94246
plot(time_per_node,ylim=c(0,15))
abline(h=max(time_per_node),lty=2)
#add node-mapping to df
df$node_id=unname(round(res$optim$bestmem))
Now it's time for the calculation on the cluster:
#start cluster
workers=parallel::makeCluster(cluster_size)
start_time=Sys.time()
#distribute jobs according to optimal node-mapping
clusterApply(workers,split(df,df$node_id),function(x) {
for (i in seq_along(x$job_id)) {
#use tryCatch to do the error handling for jobs that fail
tryCatch({Sys.sleep(x[i,"real_job_length"])},
error=function(err) {print("Do your error handling")})
}
})
end_time=Sys.time()
#how long did it take
end_time-start_time
#Time difference of 11.12532 secs
#add to plot
abline(h=as.numeric(end_time-start_time),col="red",lty=2)
stopCluster(workers)
Based on the input , it seems you are already saving the output of a task within that task.
Assuming each parallel task is saving the output as a file, you probably need an initial function that predicts the time for a particular row.
In order to do that
generate a structure with estimated time and row number
sort the the estimated time and reorder rows and run the parallel
process for each reordered rows.
This would automatically balance the workload.
We had a similar problem where the process had to be done column wise and each column took 10-200 seconds. So we generated a function to estimate time, reordered the column based on that and ran parallel process for each column.

Exporting data frames faster than write.csv()

I need some help.
I have a script in R that is preforming tasks on a data frame that is either going to be 20148000, 4029600 or 50370000 rows. I have a machine that can handle preforming the tasks at these sizes in a couple minutes depending on the size of I select. However, I need to loop this 3002, 1501 or 1201 time respectively. That total run time is fine.
The problem I am having is at the end of every loop I need to export this huge data frame. When I use a write.csv() in R, it turns my run time for one iteration from 2 minutes to 15.5 minutes. Is there something more efficient than write.csv()??

function that makes my loop to run after every x mins

I want a r function which makes my loop to run after evey 5 mins.
I have a loop that downloads market data from google finance.I want this loop to run in the interval of every 30 mins.
Is it possible?
An alternative to making your script loop: use an external job scheduling tool to call your script over the desired interval. If you have linux, I recommend checking out cron. Here's a SO response describing how to set up a cron job to kick off an R script: https://stackoverflow.com/a/10116439/819544
You can use Sys.sleep(100) to stop execution for 100 seconds. It's a little inefficient vs. running some other process in the same instance and setting up a proper timer. But it's pretty easy.

Resources