Increment date stored in a variable by one day - unix

I have a variable DATE=2015-02-08. I want a variable NEXT_DATE which will store a date value 1 day after this $DATE value.Thanks in advance.

You could convert the date to a Julian Date, add 1, then convert back. Due to the nature of our calendar, this is a bit involved (at least for shell arithmetic). Should the Wikipedia article not be enough, the calulations are explained here.

You cold try to convert that time-stamp in UNIX time, add 3600*24 seconds to it, and then convert it back again to your format.

Related

seconds since date to date in R

I have a dataset file with a time variable in "seconds since 1981-01-01 00:00:00". What I need is to convert this time into calendar date (YYYY-MM-DD HH:mm:ss). I've seen a lot of different ways to do this for time since epoch (1970) (timestamp, calendar.timegm, etc) but I'm failing to do this with a different reference date.
One option is to simply add 347133600s (11 years) to each value in seconds. this will then allow you to simply use conversion as it would be from 1970-01-01.

How do I get date time into this format in R: 1563921031?

I have to query an API with a date time stamp in R, but I can't figure out how to get my date time entered in and changed into the correct format. An example of a date time stamp that works is 1563921031 and I think it's seconds since an origin time.
Please help!
We can convert to numeric with as.numeric
as.numeric(datetime)

How to compare two dates in SQLite?

I kind of assumed it was a string, so I compared it as a string, but not surprisingly it failed. I believe thats how it works in Mysql. I could be wrong as I haven't worked on it in a while. In either case, how can I check if dates are equal in SQLite? I will be using it in a WHERE clause.
SELECT a._id, b._id, b.start_date,a.event_name, b.start_time,
b.end_date, b.end_time, b.location FROM events_info b INNER JOIN events a ON
a._id=b.event_id WHERE b.start_time = '6:00';
(added space to make it easier to look at)
SQLite doesn't have a dedicated DATETIME type. Normally what people do is make sure they store the date as a formatted string that is consistent; for example, YYYY-MM-DD hh:mm:ss. If you do so, as long as you're consistent, then you can compare dates directly:
SELECT * FROM a WHERE q_date < '2013-01-01 00:00:00';
This works because even though the comparison is technically an alphabetical comparison and not a numeric one, dates in a consistent format like this sort alphabetically as well as numerically.
For such a schema, I would suggest storing dates in 24-hour format (the above example is midnight). Pad months, days, and hours with zeros. If your dates will span multiple timezones, store them all in UTC and do whatever conversion you need client-side to convert them to the local time zone.
Normally dates and times are stored all in one column. If you have to have them separated for whatever reason, just make sure you dates are all consistent and your times are all consistent. For example, dates should all be YYYY-MM-DD and times should all be hh:mm:ss.
The reason that YYYY-MM-DD hh:mm:ss is the preferred format is because when you go from the largest date interval (years) to the smallest (seconds), you can index and sort them very easily and with high performance.
SELECT * FROM a WHERE q_date = '2012-06-04 05:06:00';
would use the index to hone in on the date/time instead of having to do a full table scan. Or if they're in two separate rows:
SELECT * FROM a WHERE q_date = '2012-06-04' AND q_time = '05:06:00';
The key is to make sure that the dates and times are in a consistent format going into the database. For user-friendly presentation, do all conversion client-side, not in the database. (For example, convert '2012-06-04 05:06:00' to "1:06am Eastern 6/4/2012".)
If this doesn't answer question, could you please post the exact format that you're using to store your dates and times, and two example dates that you're trying to compare that aren't working the way you expect them to?
Sqlite can not compare dates directly. we need to convert them in seconds as well as integer also.
Example
SELECT * FROM Table
WHERE
CAST(strftime('%s', date_field) AS integer) <=CAST(strftime('%s', '2015-01-01') AS integer) ;
From Datatypes In SQLite Version 3:
1.2 Date and Time Datatype
SQLite does not have a storage class set aside for storing dates and/or times. Instead, the built-in Date And Time Functions of SQLite are capable of storing dates and times as TEXT, REAL, or INTEGER values:
TEXT as ISO8601 strings ("YYYY-MM-DD HH:MM:SS.SSS").
REAL as Julian day numbers, the number of days since noon in Greenwich on November 24, 4714 B.C. according to the proleptic Gregorian calendar.
INTEGER as Unix Time, the number of seconds since 1970-01-01 00:00:00 UTC.
Applications can chose to store dates and times in any of these formats and freely convert between formats using the built-in date and time functions.
If you look at the examples in Date And Time Functions, something like this should get you close to what you want (which, I'm assuming, is 6:00 of the current day):
WHERE b.start_time = date('now', 'start of day', '+6 hours')

Date conversion query

I've come into possession of hundreds of ascii data files where the date and time are separate columns like so:
date time
1-Jan-08 23:05
I need to convert this to a usable R Date object, subtract 8 hours (timezone conversion from UTC to Pacific) and then turn it into unix time. I need to do this since the data are collected every evening (from 5pm through 2am the following morning). So if I were to use regular date/time format it would confound days (day1 spans two days when in fact it was just one evening of data collection). I'd like to consider each day's events separately.
Using unixtime will allow me to calculate time differences in events that occur each day (I will probably retain a date field in addition to the unix time). Can someone suggest an efficient way to do this?
Here is some data to use (this is in UTC)
dummy=data.frame(date="1-Jan-08",time="23:05")
Paste them together (which works vectorised) and then parse, e.g.
datetime <- paste(dummy$date, dummy$time)
parsed <- strptime(datetime, "%d-%b-%y %H:%M")
which you can also assign as columns in the data frame.
Edit: strptime() has an optional tz="" argument you can use.

C#: Convert AS/400 date into DateTime

Dates in DB2 AS/400 are an integer, containing the number of days since sometime around the turn of the 20th century.
Question 1: Does anyone know the IBM DB2/AS400 "zero" date? e.g.:
12/30/1899
12/31/1899
1/1/1900
Question 2: Given an "AS/400" date (e.g. 40010) how can you convert that to a CLR DateTime?
DateTime d = new DateTime(40010); //invalid
Some other "zero" dates are:
OLE Automation: 12/30/1899
SQL Server: 1/1/1900
I don't think AS/400 dates are stored internally as some number of days from an epoch date1 (this is the more common term for what you are calling "zero date"). As Tracy Probst said, this is definitely NOT what date fields in native AS/400 physical files look like.2
But that's immaterial if whatever method you are using to extract the data is giving it to you as the number of days since an epoch. Ideally, you should find out what the intended date is by looking directly at the AS/400, or asking someone who can. If the date on the AS/400 is 2009-07-30 and what you are getting is 40022, then you can be pretty confident the epoch date is Jan 1, 1900. If you are getting 40024, then the epoch is Dec 30, 1899. (Though it's of course best to compare a bunch of dates, preferably from different years to guard against possible use of Julian dates.)
Also, as Tracy commented on his own answer, it's exceedingly common for dates to be stored in generic numeric fields (which is what I would guess if your retrieval method is reporting Decimal as the data type), in which case it really has nothing to do with DB2's internal date format anyway. You should be aware that by far the most common date formats stored in AS/400 numeric fields are the following, or variations thereof:
yyyymmdd (Gregorian, ISO 4-digit year)
mmddyy (Gregorian, U.S. 2-digit year)
yyyyddd (so-called Julian, 4-digit year)
yyddd (so-called Julian, 2-digit year)
yymmdd
cyymmdd (IBM's crazy invention with century flag)
The ddd in the Julian dates is the number of days from the beginning of year. The c in IBM's crazy date is 0 for 19yy or 1 for 20yy. I have not heard of anyone who stores days-since-epoch on "The Four Hundred" but maybe you've encountered a convert from another platform. The mainframe heritage of the AS/400 strongly favors human-readable dates.
1The AS/400 (now called IBM i) does have its own data type for dates, and this data type actually does consist internally of a number of days from an epoch. But that epoch is many thousands of years in the past, not somewhere near the turn of the 20th century, and not even near the beginning of the Common Era. IBM likes to call this number of days the Scaliger number, but for most people who study this stuff, it's called the Julian Day Number. As you may have noticed from the main part of my answer, IBM uses the word "Julian" to mean something completely different (and not even related to the Julian calendar). Namely, IBM's so-called "Julian date" is really the ordinal date from ISO 8601.
2The internal format of the date data type is very low-level and mostly hidden from the user (including most programmers). The DSPPFM command, which ostensibly shows the "actual contents" of a file, is at least one step "too late": the value it reports has already been converted from the internal, 4-byte "Scaliger number" to a human-readable form.
Question 1:
I have no idea what the start date is for DB2. Google isn't very helpful anyway. Don't you have any sample data you could use to figure it out?
Update: are you sure the date is stored as a number of days? I found this page that suggests otherwise.
Question 2:
Assuming 1900-01-01 as the start date in this example, where days is the AS/400 date value.
DateTime myDate = new DateTime(1900, 1, 1).AddDays(days);
I don't know the answer for 1. But for 2, you can do something like this:
private DateTime AS400 = new DateTime(1900, 1, 1);
...
DateTime myClrDT = AS400.AddDays(days);
Question 1:
As far as I can tell, there is no "zero date" in an AS/400 phsyical file. If I do a DSPPFM on a phsyical file with a timestamp field in it, the value is stored as a readable timestamp in the format yyyy-MM-ddhh.mm.ss. For example: "2005-08-0207.06.33" for 08/02/2005 at 7:06:33 AM. There can be a zero-date within a particular programming language and that's really where you need to focus. The AS/400 ODBC driver returns the date in a SQL_TYPE_TIMESTAMP field.
Question 2:
It should be as simple as:
DateTime d = Convert.ToDateTime(reader["DateField"]);
I invite other C# experts to edit the response with better C# code.
I've just 5 months of experience in DB2(working on AS400), so i just can show you something
about the way we work with dates. It's true that we consider the 'zero' date in our calculation of the date fields. In our system, the 'zero' date =12/31/1971 0:00.
I don't know if this is the 'only' 'zero' date in AS400.
In our system files, the date we use is stored as the number of days from the 'zero' date(length=5).
So, every time we have to get the date field, from a specified file, we convert this field to get the date in the format : dd/mm/yyyy or yyyy-mm-dd(it depends from the environment where we execute the query). The function is:
date(field+719892), where field is the field where we store the date and 719892 is the number of days we add after each unconverted date we use(it seems like it is the number of days between x-12/31/1971, you can calculate x).
I'll give you on more example:
select date(15+719892) as date1 from library1.file1
The result is: date1=1972-01-15
marc_s had a comment that confused the "zero" dates with "minimum" dates in SQL Server. Just so everyone gets to see the example:
SELECT
CAST(0 AS datetime) AS dateTimeZero,
CAST(0 AS smalldatetime) AS smallDateTimeZero
dateTimeZero smallDateTimeZero
======================= ===================
1900-01-01 00:00:00.000 1900-01-01 00:00:00

Resources