The numbers used to vote when planning are 0, 0.5, 1, 2, 3, 5, 8, 13, 20, 40, 100.
Is there a meaning when those numbers are chosen? Why don't we just choose 1,2,3,4.. for the sake of simpliness?

The point is that as the estimates get bigger, they become less likely to be accurate anyway. There's no point in debating the merits of 34 vs 35 - at that point you're likely to be miles out anyway. This way just makes it easier: does this feel more like a 20-point task or a 40-point task? Not having the numbers between 21 and 39 forces you to make look at it in this "bigger" way. It should also be a hint that you should break the task down further before you come close to doing it.

All the details are explained here: http://en.wikipedia.org/wiki/Planning_poker
The sequence you give has been introduced by Mike Cohn in his book "Agile Estimating & Planning" (therefore the sequence is copyrighted, you need to obtain the permission to use it or you can also buy decks from his online shop).
The original planning poker sequence is a bit different and described he by his original inventor (James Grenning) : http://renaissancesoftware.net/papers/14-papers/44-planing-poker.html

This sequence allows you to compare backlog items to eachother. So it is imposible to say that some item is exactly two times bigger than other. Using this sequence you will always decide if it is more than two times bigger or less than two times.
For example:
First Item is estimated as 3SP
Now you are estimationg Second Item and someone said that it is two times "bigger" than First Item. Development tasks can't be exactly that same or exactle few times bigger or smaller. So you need to decide if it is bigger less than two times or more (it could be 5SP or 8SP).
If you have many estimated items in your backlog you can use this numbers for some stats. This stats works because Law of large numbers. http://en.wikipedia.org/wiki/Law_of_large_numbers
Using this sequence you are putting some uncertainty into that numbers so probability that this stats will work for you become higher.
Other simple answer for your question is: Mike Cohn chose this nubers after many experiments because they seams to work best in long period of time for various teams
All what I've wrote before is theory which has been created after experiments.

I've never seen that sequence used, the Fibonacci series (1 2 3 5 8 13 21 34) is more common. The idea is to avoid tricking yourself into thinking there is precision when there isn't.

Numbers on planning poker represent complexity of a task. You should not consider that a story with 8 as value is the double size in effort or time of a size 4 story for example. You could use as many different representations for these numbers as you want (like t-shirt sizes). You just need to have an idea that one value is more complex than another and there is another value that is even more bigger than it. The Planning Poker application attempt to illustrate this complexity with drawings related with number in order to help on this idea.

Related

Why is the Fibonacci series used in agile planning poker? [closed]

Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 8 years ago.
Improve this question
When estimating the relative size of user stories in agile software development the members of the team are supposed to estimate the size of a user story as being 1, 2, 3, 5, 8, 13, ... . So the estimated values should resemble the Fibonacci series. But I wonder, why?
The description of http://en.wikipedia.org/wiki/Planning_poker on Wikipedia holds the mysterious sentence:
The reason for using the Fibonacci sequence is to reflect the inherent
uncertainty in estimating larger items.
But why should there be inherent uncertainty in larger items? Isn't the uncertainty higher, if we make fewer measurement, meaning if fewer people estimate the same story?
And even if the uncertainty is higher in larger stories, why does that imply the use of the Fibonacci sequence? Is there a mathematical or statistical reason for it?
Otherwise using the Fibonacci series for estimation feels like CargoCult science to me.
The Fibonacci series is just one example of an exponential estimation scale. The reason an exponential scale is used comes from Information Theory.
The information that we obtain out of estimation grows much slower than the precision of estimation. In fact it grows as a logarithmic function. This is the reason for the higher uncertainty for larger items.
Determining the most optimal base of the exponential scale (normalization) is difficult in practise. The base corresponding to the Fibonacci scale may or may not be optimal.
Here is a more detailed explanation of the mathematical justification: http://www.yakyma.com/2012/05/why-progressive-estimation-scale-is-so.html
Out of the first six numbers of the Fibonacci sequence, four are prime. This limits the possibilities to break down a task equally into smaller tasks to have multiple people work on it in parallel. Doing so could lead to the misconception that the speed of a task could scale proportionally with the number of people working on it. The 2^n series is most vulnerable to such a problem. The Fibonacci sequence in fact forces one to re-estimate the smaller tasks one by one.
According to this agile blog
"because they grow at about the same rate at which we humans can perceive meaningful changes in magnitude."
Yeah right. I think it's because they add an air of legitimacy (Fibonacci! math!) to what is in essence a very high-level, early-stage sizing (not scoping) exercise (which does have value).
But you can get the same results using t-shirt sizing...
You definitely want something exponential, so that you can express any quantity of time with a constant relative error. The precision of your estimation as well is very likely to be proportional to your estimation.
So you want something :
a) with integers
b) exponential
c) easy
Now why Fibonacci instead of, 1 2 4 8?
My guess is that it's because fibonacci grows slower. It's in goldratio^n, and goldratio=1.61...
The Fibonacci sequence is just one of several that are used in project planning poker.
It is difficult to accurately estimate large units of work and it is easy to get bogged down in hours vs days discussions if your numbers are too "realistic".
I like the explanation at http://www.agilelearninglabs.com/2009/06/story-sizing-a-better-start-than-planning-poker/, namely the Fibonacci series represents a set of numbers that we can intuitively distinguish between them as different magnitudes.
I use Fibonacci for a couple of reasons:
As task gets larger the details become more difficult to grasp
Task estimate is the number of hours for anyone in the team to complete the task
Not everyone in the team will have the same amount of experience for
a particular task so that adds to the uncertainty too
Human gets fatigue over larger and potentially more complex task.
While a task twice as complex is solved in double time for a computer
it may take quite a bit more for a developer.
As we adds up all the uncertainties we are less sure of what the hours actually should be. It ends up easier if we can just gauge if this task is larger/smaller than another one where we gave a estimate of already. As we up the size/complexity of the task the effect of uncertainty is also amplified. I would be happily taking an estimate of 13 hours for a task that seems twice as large as one I've previously estimated at 5 hours.

count the number of times a value appears in a math equation [closed]

Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 8 years ago.
Improve this question
how to count the number of times a value appears in a math equation?
explanation:
suppose in an equation of a circle i want to calculate how many timw does the value of y=5 occurs.
or in a parabola how many times the equation gives the value of 5;
or how many times does sin(x) have the value of 1 in a given range
is it possible to get the count mathematically rather than computing iteratively or recursively
To find the number of times an equation equals 5, is equal to finding the number of roots for the equation minus 5.
There are no general methods for finding roots of an arbitrary function. You could use Newtons method with different start values to search for roots, but you can't in general tell whether or not you've found all of them.
Depending what you are trying to do, it may be possible to use numerical continuation. It is not easy to implement, but there are good software tools available (Pitcon is very reliable).
In general, numerical continuation attempts to solve a system of N variables and N-1 nonlinear equations. The N-th variable is allowed to vary over a domain, and the continuation method yields all the solutions to the system along a curve. A good continuation method can follow the curve going back and forth, and you can then see the resulting plot and determine the number of roots for a given parameter.
Again, numerical continuation is not easy, and it can be difficult to provide initial guesses, but it is a well known method.

How is uniformity expressed? [closed]

Closed. This question is off-topic. It is not currently accepting answers.
Want to improve this question? Update the question so it's on-topic for Stack Overflow.
Closed 10 years ago.
Improve this question
I don't know anything about statistics and it was difficult for me to find A way to describe my question that was clear.
I am doing some initial research on a system that will measure the uniformity of electricity across a conductor. Basically we need to measure how evenly a signal is spread out on a surface.
I was doing research on how to determine uniformity of a data set and came across this question which is promising. However I realized that I don't know what unit to use to express uniformity. For example, if I take 100 equally spaced measurements in a grid pattern on the surface of an object and want to describe how uniform the values are, how would you say it?
"98% uniform?" - what does that mean? 98% of what?
"The signal is very evenly dispersed" - OK, great... but there must be a more specific or scientific way to communicate that... how "evenly"? What is a numeric representation of that statement?
Statistics and math are not my thing so if this seems like a dumb question, be gentle...
You are looking for the Variance. From Wikipedia:
In probability theory and statistics, the variance is a measure of how far a set of numbers are spread out from each other. It is one of several descriptors of a probability distribution, describing how far the numbers lie from the mean
Recipe for calculating the Variance:
1) Calculate the Mean of your dataset
2) For each point, calculate (X - Mean)^2
3) Add up all those (X - Mean)^2
4) Divide the by the number of points
5) That is it
The Variance gives you an idea of how "equal" your points are. A Variance of zero, means all points are equal, and then increases as the points spread out.
Edit
Here you may find better algorithms (more numerically stable) for calculating the variance.
One has to first define "uniformity". Does it mean lack of variance in the data? Or does it also mean other things like lack of average change across a surface or over time?
If it's simply lack of variance in data, then the variance method already described is the ticket.
If you are also concerned about average "shift" in measurement across the surface, you could do a linear (or in this case a "cylindrical" or "planar") fit of the data to determine whether there's a general trend up or down in the data in either of two dimensions. (If the conductor is cylindrical, then radially and axially. If it's planar, then x/y.)
These three parameters, then, would give a reasonable uniformity measure by the above definition: overall variance (that belisarius described), and "flatness" in each of two dimensions.

Examples of mathematics algorithms that apply to game development

I am designing a RPG game like final fantasy.
I have the programming part done but what I lack is the maths. I am ok at maths but I am having trouble incorporating the players stas into mu sums.
How can I make an action timer that is based on the players speed?
How can I use attack and defence so that it is not always exactly the same damage?
How can I add randomness into the equations?
Can anyone point me to some resources that I can read to learn this sort of stuff.
EDIT: Clarification Of what I am looking for
for the damage I have (player attack x move strength) / enemy defence.
This works and scales well but i got a look at the algorithms from final fantasy 4 a while a got and this sum alone was over 15 steps. mine has only 2.
I am looking for real game examples if possible but would settle for papers or books that have sections that explain how they get these complex sums and why they don't use simple ones.
I eventually intent to implement but am looking for more academic knowledge at the moment.
Not knowing Final fantasy at all, here are some thoughts.
Attack/Defence could either be a 'chance to hit/block' or 'damage done/mitigated' (or, possibly, a blend of both). If you decide to go for 'damage done/mitigated', you'll probably want to do one of:
Generate a random number in a suitable range, added/subtracted from the base attack/defence value.
Generate a number in the range 0-1, multiplied by the attack/defence
Generate a number (with a Gaussian or Poisson distribution and a suitable standard deviation) in the range 0-2 (or so, to account for the occasional crit), multiplied by the attack/defence
For attack timers, decide what "double speed" and "triple speed" should do for the number of attacks in a given time. That should give you a decent lead for how to implement it. I can, off-hand, think of three methods.
Use N/speed as a base for the timer (that means double/triple speed gives 2/3 times the number of attacks in a given interval).
Use Basetime - Speed as the timer (requires a cap on speed, may not be an issue, most probably has an unintuitive relation between speed stat and timer, not much difference at low levels, a lot of difference at high levels).
Use Basetime - Sqrt(Speed) as the timer.
I doubt you'll find academic work on this. Determining formulae for damage, say, is heuristic. People just make stuff up based on their experience with various functions and then tweak the result based on gameplay.
It's important to have a good feel for what the function looks like when plotted on a graph. The best advice I can give for this is to study a course on sketching graphs of functions. A Google search on "sketching functions" will get you started.
Take a look at printed role playing games like Dungeons & Dragons and how they handle these issues. They are the inspiration for computer RPGs. I don't know of academic work
Some thoughts: you don't have to have an actual "formula". It can be rules like "roll a 20 sided die, weapon does 2 points of damage if the roll is <12 and 3 points of damage if the roll is >=12".
You might want to simplify continuous variables down to small ranges of integers for testing. That way you can calculate out tables with all the possible permutations and see if the results look reasonable. Once you have something good, you can interpolate the formulas for continuous inputs.
Another key issue is play balance. There aren't necessarily formulas for telling you whether your game mechanics are balanced, you have to test.

Explain the proof by Vinay Deolalikar that P != NP [closed]

Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 5 years ago.
Improve this question
Recently there has been a paper floating around by Vinay Deolalikar at HP Labs which claims to have proved that P != NP.
Could someone explain how this proof works for us less mathematically inclined people?
I've only scanned through the paper, but here's a rough summary of how it all hangs together.
From page 86 of the paper.
... polynomial time
algorithms succeed by successively
“breaking up” the problem into
smaller subproblems that are joined to
each other through conditional
independence. Consequently, polynomial
time algorithms cannot solve
problems in regimes where blocks whose
order is the same as the underlying
problem instance require simultaneous
resolution.
Other parts of the paper show that certain NP problems can not be broken up in this manner. Thus NP/= P
Much of the paper is spent defining conditional independence and proving these two points.
Dick Lipton has a nice blog entry about the paper and his first impressions of it. Unfortunately, it also is technical. From what I can understand, Deolalikar's main innovation seems to be to use some concepts from statistical physics and finite model theory and tie them to the problem.
I'm with Rex M with this one, some results, mostly mathematical ones cannot be expressed to people who lack the technical mastery.
I liked this ( http://www.newscientist.com/article/dn19287-p--np-its-bad-news-for-the-power-of-computing.html ):
His argument revolves around a particular task, the Boolean satisfiability problem, which asks whether a collection of logical statements can all be simultaneously true or whether they contradict each other. This is known to be an NP problem.
Deolalikar claims to have shown that
there is no program which can complete
it quickly from scratch, and that it
is therefore not a P problem. His
argument involves the ingenious use of
statistical physics, as he uses a
mathematical structure that follows
many of the same rules as a random
physical system.
The effects of the above can be quite significant:
If the result stands, it would prove
that the two classes P and NP are not
identical, and impose severe limits on
what computers can accomplish –
implying that many tasks may be
fundamentally, irreducibly complex.
For some problems – including
factorisation – the result does not
clearly say whether they can be solved
quickly. But a huge sub-class of
problems called "NP-complete" would be
doomed. A famous example is the
travelling salesman problem – finding
the shortest route between a set of
cities. Such problems can be checked
quickly, but if P ≠ NP then there is
no computer program that can complete
them quickly from scratch.
This is my understanding of the proof technique: he uses first order logic to characterize all polynomial time algorithms, and then shows that for large SAT problems with certain properties that no polynomial time algorithm can determine their satisfiability.
One other way of thinking about it, which may be entirely wrong, but is my first impression as I'm reading it on the first pass, is that we think of assigning/clearing terms in circuit satisfaction as forming and breaking clusters of 'ordered structure', and that he's then using statistical physics to show that there isn't enough speed in the polynomial operations to perform those operations in a particular "phase space" of operations, because these "clusters" end up being too far apart.
Such proof would have to cover all classes of algorithms, like continuous global optimization.
For example, in the 3-SAT problem we have to evaluate variables to fulfill all alternatives of triples of these variables or their negations. Look that x OR y can be changed into optimizing
((x-1)^2+y^2)((x-1)^2+(y-1)^2)(x^2+(y-1)^2)
and analogously seven terms for alternative of three variables.
Finding the global minimum of a sum of such polynomials for all terms would solve our problem. (source)
It's going out of standard combinatorial techniques to the continuous world using_gradient methods, local minims removing methods, evolutionary algorithms. It's completely different kingdom - numerical analysis - I don't believe such proof could really cover (?)
It's worth noting that with proofs, "the devil is in the detail". The high level overview is obviously something like:
Some some sort of relationship
between items, show that this
relationship implies X and that
implies Y and thus my argument is
shown.
I mean, it may be via Induction or any other form of proving things, but what I'm saying is the high level overview is useless. There is no point explaining it. Although the question itself relates to computer science, it is best left to mathematicians (thought it is certainly incredibly interesting).

Resources