I religiously go through all of my code before I check it in and do a diff of the before and after code and read through it and make sure I undersatnd the changes. Usually I end up having to add comments, amend variable names, amend algorithms, amend code, retest things, discuss with other developers about their code, add new bugs/issues, but I very rarely end up doing the checkin immediately.
I do notice however that alot of developers these days seem to check their code in and think that when the build breaks that it is enough, then they go back and look at their changes. This is one of the things about continuous build systems that I definitely do not like, in that sometimes I think developers stop thinking about their code enough.
What best practices are there for ensuring only quality code goes into continuous build systems?

I do notice however that alot of developers these days seem to check their code in and think that when the build breaks that it is enough, then they go back and look at their changes.
In my opinion, using the continuous build for "verification" purpose is indeed a bad practice, developers should always try to not commit bad code that can affect the team and interrupt the work (the why is so obvious that if you don't get that, just look for another job). So, if your CI engine doesn't offer Pre-tested commit (like TeamCity, Team Foundation Server as I just saw, maybe Hudson one day, etc), you should always sync/build/sync (and rebuild if necessary) locally before to commit. Not doing this is laziness and not respectful of the team.
What best practices are there for ensuring only quality code goes into continuous build systems?
Just in case, remind why breaking the build is bad: bad code potentially affects the whole team and interrupts the work (sigh).
If you can get tool support (see the mentioned solutions above), get it.
If not, document the right workflow: 1. sync 2. build locally 3. sync 4. back to 2 if required 5. commit. Make this visible so that there is no excuses.
If this is an option, use something like (or similar to) the Hudson's Continuous Integration Game plugin. This can make things more fun.
I've seen people using a light financial "penalty" for broken build but I don't really like this idea. First, we should be able to behave as responsible adults. Second, the obtained result was that people started to delay commits (which at the end was the opposite of the expected benefit).

Team Foundation Server has something called pre checkin validation.

Related

Upgrading from Drupal 6 to Drupal 7: best programmer's practices?

Although I am using drupal since the D4 series, I only started developing professionally for it with D6, so - despite I did various site upgrades - I was never faced by the task of having to port my own code to a new version.
I know the Drupal community will come up with lot of technical support about changed API's and architectural changes (see the deadwood module for D5-D6 or even these stubs of D6-D7 how-to's for modules and themes).
However what I am looking for with my question is more in the line of strategy thinking, or in other words, I am looking for inputs and advice on how to plan / implement / review the process of porting my own code, in the light of what colleague developers learned by previous experience. Some example:
Would you advice to begin to port my modules as soon as I have time for doing it, and to maintain a concurrent D7 for some time (so I am "prepared" for the D-day) or would you advice to rather wait for the day in which the port will be actually imminent and then upgrade the modules to D7 and drop the D6 version?
Only some of my modules have full test coverage. Would you advice to complete test coverage for the D6 version so to have all tests working to check the D7 port, or would you advice to write my test directing at porting time, to test the D7 version?
Did you find that being an early adopter gives you an edge in terms of new features and better API's or did you rather find that is more convenient to delay the conversion so as to leverage the larger amount of readily available contrib modules?
Did you set for yourself quality standards / evaluation criteria or did you just set the bar to "if it works, I'm happy"? Why? If you set certain standards or goals, what did they where / what will they be? How did they help you?
Are there common pitfalls that you experienced in the past and that you think are applicable to the D6-D7 porting process?
Is porting a good moment to do some refactoring or it is just going to make everything more complex to be put back together?
...
These questions are not an exhaustive list, but I hope they give an idea of what kind of information I am looking for. I would rather say: whatever you think is relevant and I did not list above gets a "plus"! :)
If I did not manage to express myself clearly enough, please post a comment with the info you think I should add in the question. Thank you in advance for your time!
PS: Yes I know... D7 is not yet out and it will take months before important contrib modules will be upgraded... but it's never too early to start thinking! :)
Good questions, so let's see:
(when to start porting)
This certainly depends on the complexity of the modules to port. If there are really complex/large ones, it might be useful to start early in order to find tricky spots while not being under pressure. For smaller/standard ones, I'd try to find a bigger time slot later on where I can port many of them in a row in order to get the routine stuff memorized quickly (and benefit from the probably improved documentation).
(test coverage)
Normally I'd say that having a good test coverage before starting refactoring/porting would certainly be advisable. But given that Drupal-7 introduces a major change concerning the testing framework by moving it to core, I'd expect the need to rewrite a significant amount of tests anyway. So if there is no need to maintain the Drupal-6 versions after the migration, I'd save the time/trouble and aim for increased coverage after the porting.
(early adopter vs. wait and see)
Using Drupal since the 4.7 version, we have always waited for at least the first official release of a new major version before even thinking about porting. With Drupal 6, we waited for the views module before porting our first site, and we still have some smaller projects on Drupal-5, as they are working just fine and it would be hard to justify the extra bill for our clients as long as there are still maintenance/security fixes for it. There is just so much time in a day and there is always this backlog of bugs to fix, features to add, etc., so no use playing with unfinished technology while there are more imminent things to do that would immediately benefit our clients. Now this would certainly be different if we'd have to maintain one or more 'official' contributed modules, as offering an early port would be a good thing.
I'm a bit in a bind here - being an early adopter certainly benefits the community, as someone has to find that bugs before they can get fixed, but on the other hand, it makes little business sense to fight hour after hour with bugs others might have found/fixed if you'd just waited a bit longer. As long as I have to do this for a living, I need to watch my resources, trying to strike an acceptable balance between serving the community and benefiting from it :-/
(quality standards)
"If it works, I'm happy" just doesn't cut it, as I don't want to be happy momentarily only, but tomorrow as well. So one of my quality standards is that I need to be (somewhat) certain that I 'grokked' new concepts well enough in order to not just makes things work, but make them work like they should. Now this is hard to define more precisely, as it is obviously impossible to know if one 'got it' before 'getting it', so it boils down to a gut feeling/distinction of 'yeah, it kinda works' vs. 'yup, that looks right', and one has to accept that he will quite regularly be wrong about this.
That said, one particular point I'm looking out for is 'intervene as early as possible'. As a beginner, I often tweaked stuff 'after the fact' during the theming stage, while it would have been much easier to apply the 'fix' earlier in the processing chain by means of one hook or the other. So right now, whenever I'm about to 'adjust' something in the theme layer, I deliberately take a small time out to check if this can not be done more cleanly/compatible within a hook earlier on. As I expect Drupal-7 to add even more hooking options, this is something I will pay extra attention to, as it usually reduces conflicts and sudden 'breaking of stuff' when adding new modules.
(common pitfalls)
Well - mainly porting to early, finding out afterwards/in between that one or more needed modules were not available for the new version at all, or only in dev/alpha/early beta state. So I'd make sure to compile a complete list of used/needed modules first, listing their porting state, along with a quick inspection of their issue queues.
Besides that, I have so far always been very pleased with the new versions and their improvements, and I'm looking forward for Drupal-7 again.
(refactoring while porting)
One could say that porting is a rather large refactoring in itself, so there is no need to add to the complexity by restructuring non porting related stuff. On the other hand, if you already have to shred your modules to pieces anyway, why not use the opportunity to make it a major overhaul? I'd try to draw a line based on complexity - for big/complex modules, I'd do the port as straight as possible, and refactor more later on, if need be. For smaller modules, it shouldn't really matter, as the likelihood of introducing subtle bugs should be rather small.
(other stuff)
... need to think about it ...
Ok, other stuff:
Resource needs - given some of the Drupal-7 threads, it looks like they are likely to go up, so this should be evaluated before porting smaller sites that sit on a shared/restricted hosting account.
Latest versions first - This one is rather obvious and always stressed in the upgrade guides, but nevertheless worth mentioning: Upgrade core and all modules to their latest current version first before doing a major upgrade, as the upgrade code is highly likely to depend on the latest table/data structures to work correctly. Given Drupals 'piecemeal', one step at a time update strategy, it would be very hard to implement upgrade code that would detect different pre-upgrade states and acted accordingly.

Project nearing completion. Time to begin testing. Which methods are feasible towards the end of the development cycle?

Let's assume one joins a project near the end of its development cycle. The project has been passed on across many teams and has been an overall free-for-all with no testing whatsoever taking place along the whole time. The other members on this team have no knowledge of testing (shame!) and unit testing each method seems infeasible at this point.
What would the recommended strategy for testing a product be at this point, besides usability testing? Is this normally the point where you're stuck with manual point-and-click expected output/actual output work?
I typically take a bottom-up approach to testing, but I think in this case you want to go top-down. Test the biggest components you can wrap unit-tests around and see how they fail. Those failures should point you towards what sub-components need tests of their own. You'll have a pretty spotty test suite when this is done, but it's a start.
If you have the budget for it, get a testing automation suite. HP/Mercury QuickTest is the leader in this space, but is very expensive. The idea is that you record test cases like macros by driving your GUI through use cases. You fill out inputs on a form (web, .net, swing, pretty much any sort of GUI), the engine learns the form elements names. Then you can check for expected output on the GUI and in the db. Then you can plug in a table or spreadsheet of various test inputs, including invalid cases where it should fail and run it through hundreds of scenarios if you like. After the tests are recorded, you can also edit the generated scripts to customize them. It builds a neat report for you in the end showing you exactly what failed.
There are also some cheap and free GUI automation testing suites that do pretty much the same thing but with fewer features. In general the more expensive the suite, the less manual customizition is necessary. Check out this list: http://www.testingfaqs.org/t-gui.html
I think this is where a good Quality Assurance test would come in. Write out old fashioned test cases and hand out to multiple people on the team to test.
What would the recommended strategy for testing a product be at this point, besides usability testing?
I'd recommend code inspection, by someone/people who know (or who can develop) the product's functional specification.
An extreme, purist way would be to say that, because it "has been an overall free-for-all with no testing whatsoever", therefore one can't trust any of it: not the existing testing, nor the code, nor the developers, nor the development process, nor management, nothing about the project. Furthermore, testing doesn't add quality to software (quality has to be built-in, part of the development process). The only way to have a quality product is to build a quality product; this product had no quality in its build, and therefore one needs to rebuild it:
Treat the existing source code as a throw-away prototype or documentation
Build a new product piece-by-piece, optionally incorporating suitable fragments (if any) of the old source code.
But doing code inspection (and correcting defects found via code inspection) might be quicker. That would be in addition to functional testing.
Whether or not you'll want to not only test it but also spend the extra time effort to develop automated tests depends on whether you'll want to maintain the software (i.e., in the future, to change it in any way and then retest it).
You'll also need:
Either:
Knowledge of the functional specification (and non-functional specification)
Developers and/or QA people with a clue
Or:
A small, simple product
Patient, forgiving end-users
Continuing technical support after the product is delivered
One technique that I incorporate into my development practice when entering a project at this time in the lifecycle is to add unit tests as defects are reported (by QA or end users). You won't get full code coverage of the existing code base, but at least this way future development can be driven and documented by tests. Also this way you should be assured that your tests fail before working on the implementation. If you write the test and it doesn't fail, the test is faulty.
Additionally, as you add new functionality to the system, start those with tests so that at least those sub-systems are tested. As the new systems interact with existing, try adding tests around the old boundary layers and work your way in over time. While these won't be Unit tests, these integration tests are better than nothing.
Refactoring is yet another prime target for testing. Refactoring without tests is like walking a tight rope without a net. You may get to the other side successfully, but is the risk worth the reward?

How to release a subset of deliverables?

Further to my question at accidentally-released-code-to-live-how-to-prevent-happening-again. After client UAT we often have the client saying they are happy for a subset of features to be released while others they want in a future release instead.
My question is "How do you release 2/3 (two out of 3) of your features".
I'd be interested in how the big players such as Microsoft handle situations like..
"Right we're only going to release 45/50 of the initially proposed features/fixes in the next version of Word, package it and ship it out".
Assuming those 5 features not being released in the next release have been started.. how can you ignore them in the release build & deployment?
How do you release 2/3 of your developed features?
How to release a subset of deliverables?
-- Lee
If you haven't thought about this in advance, it's pretty hard to do.
But in the future, here's how you could set yourself up to do this:
Get a real version control system, with very good support for both branching and merging. Historically, this has meant something like git or Mercurial, because Subversion's merge support has been very weak. (The Subversion team has recently been working improving their merge support, however.) On the Windows side, I don't know what VC tools are best for something like this.
Decide how to organize work on individual features. One approach is to keep each feature on its own branch, and only merge it back to the main branch when the new feature is ready. The goal here is to keep the main branch almost shippable at all times. This is easiest when the feature branches don't sit around collecting dust—perhaps each programmer could work on only 1 or 2 features at a time, and merge them as soon as they're ready?
Alternatively, you can try to cherry-pick individual patches out of your version control history. This is tedious and error-prone, but it may be possible for certain very disciplined development groups who write very clean patches that make exactly 1 complete change. You see this type of patch in the Linux kernel community. Try looking at some patches on the Linux 2.6 gitweb to see what this style of development looks like.
If you have trouble keeping your trunk "almost shippable" at all times, you might want to read a book on agile programming, such as Extreme Programming Explained. All the branching and merging in the world will be useless if your new code tends to be very buggy and require long periods of testing to find basic logic errors.
Updates
How do feature branches work with continuous integration? In general, I tend to build feature branches after each check-in, just like the main branch, and I expect developers to commit more-or-less daily. But more importantly, I try to merge feature branches back to the main branch very aggressively—a 2-week-old feature branch would make me very, very nervous, because it means somebody is living off in their own little world.
What if the client only wants some of the already working features? This would worry me a bit, and I would want to ask them why the client only wants some of the features. Are they nervous about the quality of the code? Are we building the right features? If we're working on features that the client really wants, and if our main branch is always solid, then the client should be eager to get everything we've implemented. So in this case, I would first look hard for underlying problems with our process and try to fix them.
However, if there were some special once-in-a-blue-moon reason for this request, I would basically create a new trunk, re-merge some branches, and cherry-pick other patches. Or disable some of the UI, as the other posters have suggested. But I wouldn't make a habit of it.
This reminds me a lot of an interview question I was asked at Borland when I was applying for a program manager position. There the question was phrased differently — there's a major bug in one feature that can't be fixed before a fixed release date — but I think the same approach can work: remove the UI elements for the features for a future release.
Of course this assume that there's no effect of the features you want to leave out with the rest of what you want to ship... but if that's the case just changing the UI is easier than trying to make a more drastic change.
In practice what I think you would do would be to branch the code for release and then make the UI removals on that branch.
Its usually a function of version control, but doing something like that can be quite complicated depending on the size of the project and how many changesets/revisions you have to classify as being desired or not desired.
A different but fairly successful strategy that I've employed in the past is making the features themselves configurable and just deploying them as disabled for unfinished features or for clients who don't want to use certain features yet.
This approach has several advantages in that you don't have to juggle what features/fixes have been merged and have not been merged, and depending on how you implement the configuration and if the feature was finished at the time of deployment, the client can change their mind and not have to wait until a new release to take advantage of the additional functionality.
That's easy, been there done that:
Create a 2/3 release branch off your current mainline.
In the 2/3 release branch, delete unwanted features.
Stabilize the 2/3 release branch.
Name the version My Product 2.1 2/3.
Release from the 2/3 release branch.
Return to the development in the mainline.

How to make a build (java) as "CM-independent" as possible? (CM=Configuration Manager)

I have been thinking of making one of the project builds I handle, as "independent" of me(CM)as I possibly can. By this I dont just mean automation via scripts/tools - although it definitely includes it. This is a project subject to much chaos and so "total" automation would not be realistic.
Here is what I'm aiming for:
Anybody should be able to do the build (with some automation and a bit of documentation/guidelines) - for instance - a newbie CM, or even a developer with no CM experience.
My first thoughts are to achieve this by:
Nailing the Build request process (via build forms which capture ALL details required for the build so that nothing falls down the cracks just because its in someone's head)
Simplifying the build steps so that they can be captured in a simple documentation as a sequence of commands - a trained monkey should be able to run with the build (well.. not hurling insults but - you get the idea :-) )
Using the tool's features to the hilt (read ANT,SVN) such that the potential issues are caught well in advance and also help provide better alerts in case of failures/issues.
Having the freedom to fall ill or take those occasional holidays without the project manager getting panic attacks everytime i mention a couple of days' off. :-)
I'd be glad to have some thoughts and ideas to help me in this direction. Thanks all!
At Urbancode, we refer to this as the "Bob the Builder" anti-pattern. The good news is that Bob (you) wants to get out of the loop. When the build guy can't go on vacation or get sick without parts of the process grinding to a halt, there really is an unacceptable problem. If I'm a betting man, as you start the process of simplifying the process down to "trained monkey" levels, you'll wonder why you're spending your time doing this rote stuff when you're smart and could actually be adding value somewhere.
The symptoms of "Bob the Builder" syndrome in our book:
All requests for builds, or builds of a certain type, go through an individual or small team.
Response to these build requests is annoyingly slow for developers. If the build team is at lunch, they wait hours.
Bob, or the team of Bobs, spend a significant percentage of their time doing rote tasks.
The Bobs going home for the day, going to lunch, going on vacation, or getting sick impede the ability of the team to get things done.
We tell our AnthillPro customers to push all of this kind of stuff into their automation. Having two build types that use different machines, different build numbers, etc shouldn't be a problem.
The first step is to dumb down the process. Drive as much complexity out as possible so that you can get down to the "trained monkey" process. Once you have something approaching that, replacing the monkey with a computer is pretty easy.
I'd give more specific advice, but I don't think you've told us where the complexity comes from, other than chaos. Sometimes in this situation you need to attack chaotic and bad practices. Are you doing builds that are "This baseline in source code and those two files and these three files?" That would be tricky and probably need a CMer in the loop. Find a way to forbid it. Replacing that with "Create a branch, and make specific changes to that branch" makes constructing the build doable by that monkey.
You should be able to argue for those changes as high risk. Even though you are good, you will have bad days and want to take human error out of the equation as much as possible. At the same time, if you're shooting for faster response to the developers and self service (which presumably development and management want) some things will need to be made automateable / monkeyable.
Having better forms can be good in the interim, and using your tools well is always good but I would attack the the "trained monkey" problem pretty aggressively. Anything that can't be done by a trained monkey (or a computer) should be a candidate for leaving the process. Once you have it down to "trained monkey" status, get your build automation in place so neither you nor the developers need to be monkeys. That changes your role from "Bob the Builder" to "Bob the Build System Owner".
Simplifying the build steps so that they can be captured in a simple documentation as a sequence of commands - a trained monkey should be able to run with the build (well.. not hurling insults but - you get the idea :-) )
If that is possible than it should be possible to run the build in one step via a script (mayy it be an ant, bash, maven or whatever script). That should be the goal, so basically anybody can do the build.
The goal of developing a build process should be this:
Start with an empty directory anywhere (tabula rasa, if you will)
Make sure a very small tools of basic tools is intalled (for me that's usually Java + Maven + SVN command line client)
Check out a single directory from your SVN/CVS/...
Start a single command (and that means something that doesn't have 25 parameters)
Wait (possibly quite a while)
Have your complete build
If you can't do that, then your build process is still not good enough.
If you think that you can't achieve it, then describe in detail which actions you need to do in addition to that list are not possible to do by a turing-complete machine.
Usually there isn't such a point. It's only the missing tools/know-how/motivation. I, personally, found out that it's easier to do this, than to describe why it can't be done.
Good luck.

How do you handle unit/regression tests which are expected to fail during development?

During software development, there may be bugs in the codebase which are known issues. These bugs will cause the regression/unit tests to fail, if the tests have been written well.
There is constant debate in our teams about how failing tests should be managed:
Comment out failing test cases with a REVISIT or TODO comment.
Advantage: We will always know when a new defect has been introduced, and not one we are already aware of.
Disadvantage: May forget to REVISIT the commented-out test case, meaning that the defect could slip through the cracks.
Leave the test cases failing.
Advantage: Will not forget to fix the defects, as the script failures will constantly reminding you that a defect is present.
Disadvantage: Difficult to detect when a new defect is introduced, due to failure noise.
I'd like to explore what the best practices are in this regard. Personally, I think a tri-state solution is the best for determining whether a script is passing. For example when you run a script, you could see the following:
Percentage passed: 75%
Percentage failed (expected): 20%
Percentage failed (unexpected): 5%
You would basically mark any test cases which you expect to fail (due to some defect) with some metadata. This ensures you still see the failure result at the end of the test, but immediately know if there is a new failure which you weren't expecting. This appears to take the best parts of the 2 proposals above.
Does anyone have any best practices for managing this?
I would leave your test cases in. In my experience, commenting out code with something like
// TODO: fix test case
is akin to doing:
// HAHA: you'll never revisit me
In all seriousness, as you get closer to shipping, the desire to revisit TODO's in code tends to fade, especially with things like unit tests because you are concentrating on fixing other parts of the code.
Leave the tests in perhaps with your "tri-state" solution. Howeveer, I would strongly encourage fixing those cases ASAP. My problem with constant reminders is that after people see them, they tend to gloss over them and say "oh yeah, we get those errors all the time..."
Case in point -- in some of our code, we have introduced the idea of "skippable asserts" -- asserts which are there to let you know there is a problem, but allow our testers to move past them on into the rest of the code. We've come to find out that QA started saying things like "oh yeah, we get that assert all the time and we were told it was skippable" and bugs didn't get reported.
I guess what I'm suggesting is that there is another alternative, which is to fix the bugs that your test cases find immediately. There may be practical reasons not to do so, but getting in that habit now could be more beneficial in the long run.
Fix the bug right away.
If it's too complex to do right away, it's probably too large a unit for unit testing.
Lose the unit test, and put the defect in your bug database. That way it has visibility, can be prioritized, etc.
I generally work in Perl and Perl's Test::* modules allow you to insert TODO blocks:
TODO: {
local $TODO = "This has not been implemented yet."
# Tests expected to fail go here
}
In the detailed output of the test run, the message in $TODO is appended to the pass/fail report for each test in the TODO block, so as to explain why it was expected to fail. For the summary of test results, all TODO tests are treated as having succeeded, but, if any actually return a successful result, the summary will also count those up and report the number of tests which unexpectedly succeeded.
My recommendation, then, would be to find a testing tool which has similar capabilities. (Or just use Perl for your testing, even if the code being tested is in another language...)
We did the following: Put a hierarchy on the tests.
Example: You have to test 3 things.
Test the login (login, retrieve the user name, get the "last login date" or something familiar etc.)
Test the database retrieval (search for a given "schnitzelmitkartoffelsalat" - tag, search the latest tags)
Test web services (connect, get the version number, retrieve simple data, retrieve detailed data, change data)
Every testing point has subpoints, as stated in brackets. We split these hierarchical. Take the last example:
3. Connect to a web service
...
3.1. Get the version number
...
3.2. Data:
3.2.1. Get the version number
3.2.2. Retrieve simple data
3.2.3. Retrieve detailed data
3.2.4. Change data
If a point fails (while developing) give one exact error message. I.e. 3.2.2. failed. Then the testing unit will not execute the tests for 3.2.3. and 3.2.4. . This way you get one (exact) error message: "3.2.2 failed". Thus leaving the programmer to solve that problem (first) and not handle 3.2.3. and 3.2.4. because this would not work out.
That helped a lot to clarify the problem and to make clear what has to be done at first.
I tend to leave these in, with an Ignore attribute (this is using NUnit) - the test is mentioned in the test run output, so it's visible, hopefully meaning we won't forget it. Consider adding the issue/ticket ID in the "ignore" message. That way it will be resolved when the underlying problem is considered to be ripe - it'd be nice to fix failing tests right away, but sometimes small bugs have to wait until the time is right.
I've considered the Explicit attribute, which has the advantage of being able to be run without a recompile, but it doesn't take a "reason" argument, and in the version of NUnit we run, the test doesn't show up in the output as unrun.
I think you need a TODO watcher that produces the "TODO" comments from the code base. The TODO is your test metadata. It's one line in front of the known failure message and very easy to correlate.
TODO's are good. Use them. Actively management them by actually putting them into the backlog on a regular basis.
#5 on Joel's "12 Steps to Better Code" is fixing bugs before you write new code:
When you have a bug in your code that you see the first time you try to run it, you will be able to fix it in no time at all, because all the code is still fresh in your mind.
If you find a bug in some code that you wrote a few days ago, it will take you a while to hunt it down, but when you reread the code you wrote, you'll remember everything and you'll be able to fix the bug in a reasonable amount of time.
But if you find a bug in code that you wrote a few months ago, you'll probably have forgotten a lot of things about that code, and it's much harder to fix. By that time you may be fixing somebody else's code, and they may be in Aruba on vacation, in which case, fixing the bug is like science: you have to be slow, methodical, and meticulous, and you can't be sure how long it will take to discover the cure.
And if you find a bug in code that has already shipped, you're going to incur incredible expense getting it fixed.
But if you really want to ignore failing tests, use the [Ignore] attribute or its equivalent in whatever test framework you use. In MbUnit's HTML output, ignored tests are displayed in yellow, compared to the red of failing tests. This lets you easily notice a newly-failing test, but you won't lose track of the known-failing tests.

Resources