I have a xml which, which has been created through net.sf.mpxj. in xml i have a milestone and a Task which are closed complete. when i import this xml to Microsoft project 2016, MileStone %Complete is changed back to 99%.
For task i dont see any issue. its showing 100%
Few Observations:
Actual Finish is showing N/A( from XML i am sending actual end date, not sure why its becoming N/A)
% Work Complete is showing 0
Has anyone faced this issue before, if so could you please help me!.
Thanks in advance.

I had a quick look at this using your sample XML file. I tried various combinations of date, work, and duration attributes to get Project to report the percent complete correctly, but the only thing which worked for me was to supply an explicit percent complete value for the task. The only thing I can think is that Project is trying to calculate the percent complete value, but has a rounding error which means you never quite get to 100%.

Related

DialogFlow wrong year when no year is specified

I am currently trying to create my own Google Agent using DialogFlow and while everything is going fine, I am finding myself unable to solve the smallest of problems.
Google has a tendency to add an additional year to the datetime object whenever I state a date. An example:
If I say "How much did we produce 29/6?" (6/29 doesn't work either) it will grab the date and format it correctly to the 6th of June, however it will make it year 2021 instead of 2020... Is there any way to make it default to our current year, unless I specifically say a different year?
Can you try saying "How much did we produce on June 29th?" I think it may have some issue processing the string "29/6" and somehow it gets translated to 6th of June.
You had mentioned "6th of June" is formatted correctly when giving "29/6", shouldn't it be "29th of June"?

Grafana graph to display call response time

I have been playing with Grafana for a while, and got stuck with the following issue.
I need to produce a chart that displays the round trip time for some REST calls my application is doing.
I am using Dropwizard metrics and starting a PausableTimer when I fire the call, and stop it when the expected response comes back. From Grafana, then, I can see the data source I need but when I build the graph, I am forced to apply some statistical calculation on my data (stddev, mean, max, min, etc.) whereas all I need is to chart the numbers from the series.
Below is a screenshot of the config part I am referring to:
The dropdown contains a number of transformations to apply to the priginal data, and I cannot find a way to tell Grafana that I wans to display the data the way it is.
I am not really sure how to do this, had anyone had this issue before -- and solved it?
Thanks in advance.

Drupal 6: Heartbeat module is "missing" some content

I’m using the heartbeat module on my site to make an activity-stream and recently I discovered that it doesn’t display all the new comments.
I’ve displayed group messaging ‘cause I only want to display #username commented on #node_title and nothing more. But for some reason, when there is several comments submitted within a short range of time it either only displays one of the comments or nothing or it makes an entry in the activity-stream which is just blank.
Before I was using the built-in comment-template in Heartbeat but now I’ve tried to create my own instead. It works when I post a comment but when testing it and makes two comments within e.g. 30 seconds it still makes the error.
Are there any known problems with this issue or am I missing something?? I haven’t detected the problem with adding new nodes, which also can occur within a short period of time on my time.
Thanks
Sincere
- Mestika
If you are having display failures in Views, there is a patch someone worked out in February 2012 for Views 6.x-3.x - you might want to try that. It fixes the display for a bunch of fields. See http://drupal.org/node/1295570

Changing the date on my web server stops my ASP.NET app from working

I'm trying to write some code that checks the number of days between two dates, when I set the date on my IIS7 server to anytime in the future I get the standard "Internet Explorer cannot display the webpage" screen. This happens if I comment out all my date checking code, with todays date it loads with any future date it doesn't. I've tried rerunning IISReset which makes no difference.
Anyone seen this before?
Thanks
Jamie
You've proven that you can retreive the current system date from the server.
IMO, now you can go ahead and fudge the numbers by reading test dates from a file (override.txt, or whatever) and test your date calculation scenarios without having to mess with the server.
You will want to make sure that you have a common function for getting the system date, so that you can override in one spot. So if you're not already set to do that, re-tool the code a bit, re-test to ensure that you get the system date properly. Then drop in your override file and test away.

Drupal vote_up_down module reporting incorrect points

I am working on a project using Drupal 6 (6.11 at the moment, haven't yet upgraded to 6.12) and part of the core functionality is the ability to vote on nodes. I'm having some rather weird behaviour that has taken me an age to track down and now I have, I still can't fix it.
This is what I've managed to figure out so far:
The template file sites/default/modules/vote_up_down/theme/vote_up_down_points.tpl.php automatically calls the function template_preprocess_vote_up_down_points() from vote_up_down.module.
vote_up_down.module then queries the database using the values stored in the $variables array that is passed to it
On only one of the 3 occasions this is called on a typical node (in this case forum posts) $variables doesn't have a value for $variables['cid'].
That one occasion is when it reads the score so as to display it below the post itself. And, instead of locating the current post's score, it locates the first-ever-voted-on post's score. (This is because instead of returning the score of one post, it returns the score of all posts and then uses the first one from the list).
I am assuming that $variables is a system-wide constant (looking at the content of it using print_r seems to confirm that) and so perhaps this is a core bug as it should always be the same. I checked the contents of $variables and the only 4 parts of around 50 that are different in the one that doesn't work are: cid - blank, tag - blank (although this is discovered by the function and correctly substituted as 'vote'), zebra - even & id - 2. I imagine the last 2 are not really important for this, so the key must be in why $variables['cid'] is not being passed through.
So, my questions are:
Has anyone had this problem before and how did you fix it?
If not, do you have any tips as to how I can figure out why this is not working correctly?
I can't tell you the answer, but you'll probably have better luck posting this in the module's issue queue, since then the maintainer and others using it will see it.
I can't believe I didn't try this before, but I just upgraded to the latest development snapshot of vote_up_down and the problem went away. A 2 minute fix in the end vs about 6 hours of trying to tie the problem down.
Lesson learnt!

Resources