How to implement CMMI level 2 with Scrum? [closed] - scrum

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 8 years ago.
Improve this question
We are currently interested in implementing CMMI level 2 for our development processes. I've read some documents about CMMI and also Scrum. Personally I'm interested in Scrum as our native development processes because it can be easy for all team members to use (we are just a small team), but I have a few questions:
Has anyone implemented CMMI level 2 With Scrum?
Any suggestions for CMMI and Agile? Are these easier to use than Scrum or Scrum-like approaches?
Also any suggestions for tools related to this topic and our requirements.
Best regards!

As Matt ("GreenMatt") noted, one of the resources is the Agile CMMI blog.
I am the author of that blog, and I'm also a CMMI appraiser, so, I can provide you with first-hand information on achieving CMMI levels while also incorporating agile practices.
Rob's response is correct, to a degree, but can also be taken the wrong way. Your processes must be known to you, which is more important (and different) from being "documented". You need to plan your processes so that you can manage them at maturity level 2. Also, your processes would need to be conducted in such a way that they are able to achieve certain goals that are listed in CMMI.
For Maturity Level 2 and Scrum, what's important is that you are truly following Scrum and are not leaving out the hard parts like: calculating velocity & using velocity to set sprint backlogs, setting sprint goals, and not disrupting the sprint in the middle, etc.
As Rob correctly pointed out, CMMI contains no processes. What CMMI does have are only practices to improve your processes. That means you do need to know your process in the first place or CMMI will only confuse matters.
Matt is right, it's not the CMMI makes things hard, it's just that poor uses of CMMI makes things hard. And, he's also correct that ML2 has little to do with the actual development and much more to do with running the project and managing scope. The bottom line is that CMMI and Scrum at ML2 is very easy together, as long as you are clear about how you're using both.
These are some of the tips I can easily provide in a forum like this. Feel free to look me up and get in touch for a more detailed conversation.

[soapbox] After being through CMMI certification at a few places, I'm not a fan. That said, neither am I one of those who say it is evil; I just think it is poorly applied or mis-applied more often than not. However, for some types of work it is required, even if it is not providing anything useful ... [/soapbox]
Anyway, none of the places I've worked have done Scrum and CMMI, so I can't tell of first hand experiences. (As Rob Goodwin submitted while I was typing my answer) CMMI doesn't tell you what to do, other than documenting your procedures and then following what your documentation says ... and documenting that! Fortunately, you can modify your procedure documents when necessary.
CMMI L2 deals mostly with project and configuration management; it doesn't have that much to do with the actual software development process (and in fact can be applied to non-software development work). Thus, as long as your documentation is kept in order and details what you are going to do with Scrum techniques (and you keep it up-to-date) you should be fine.
A couple resources I've seen during my CMMI experiences about blending Agile and CMMI are the Agile CMMI blog and Broadsword Solutions agileCMMI product. Not being well versed in either CMMI or Agile (we just sort of wing it where I am!), I don't know how good they are.

CMMI does not dictate what your processes are, just that you have some, they are documented, and that you follow them.

Here's a tool for Scrum:
http://www.firescrum.org/

Related

Losing a programmer, what steps to take? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
One of the programmers on our team is leaving for greener pastures. We will be going from 6 to 5. What steps should we take to ensure our development process continues to run smoothly, potentially while integrating in new blood.
We are currently working on a short release cycle with iterative development. Design - code - review. The person leaving was the most senior dev on the team, and would often give lots of feedback to the rest of the team, especially during the design phase.
There are few things you can do (in that order):
Reevaluate your estimates, based on the experience of the remaining team members and the work items load balance
Come up with a prioritized list of things you might have to cut
Seek a suitable replacement (as aggressive as possible)
Start a discussion with your company management on potential compensation package changes that would allow you to retain valuable human assets like the leaving guy
Update: Use this as an opportunity to build up your team. Throw a goodbye party for the guy that's leaving and make sure both he and the team are aware that his contributions were valued. :-) (And if you don't have a budget, just talk to the team members and you all chip in to get him out for a drink or two)
I agree with Franci, with a modest modification to priorities:
Start a discussion with your company management...
Yes. By all means. Today. If your best is leaving, your second best probably isn't far behind. Talk with the remaining developers. Are they happy? Are you sure? Are they just talking nice to you out of respect for your authority but have mysterious "doctor's appointments" that crop up? If you were a member of the team, would you be looking?
Pair-programming is a useful technique for mitigating the problems created by the departure of a skilled employee because it spreads knowledge. It's also useful for mentoring new employees.
You can find another senior developer who is generous with feedback to his coworkers. Good luck.
Avoid specialization in the first place. If you have more than 0 days for transition, it's a luxury. People get sick, die, run away, get arrested, get fired, etc., every day. So continuity of the project needs to assume that sooner or later, someone will unexpectedly stop coming to work. I know of a case where a guy was arrested at his desk, lead away in handcuffs, and his PC was immediately taken to a lab for forensic investigation. Not much time for knowledge transfer there.
Code reviews, design reviews, and problem ticket/research rotation will familarize the entire team with all aspects of the system.

scrum and refactoring [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 7 years ago.
Improve this question
If everything in scrum is all about functional things that a user can see is there really any place for refactoring code unrelated to any new functional requirements?
I don't think that this has as much to do with Scrum as it does with project management philosophy.
Regardless of whether a project uses Scrum or not, many project managers do not like developers spending time on "unnecessary" things like code refactoring or restructuring that doesn't directly advance one of the outstanding functional requirements. It's not "work that yields results" like normal development, it's "work that prevents a delay of results later". Given the typically short time-lines used for Sprints, the benefit is often hard to see and nearly impossible to quantify.
Keeping code maintainable needs to be an item on your burn-down list (if you use a Scrum). It is just as important as new development. While it may not seem like something that is "visible to the user", ignoring it increases your technical debt. Down the road when the technical debt piles up enough that your code's lack of maintainability slows down development, the delays in new feature development will be visible to customers.
It's all a matter of management/philosophy. Instead of looking at refactoring and maintainability enhancements as "extra" work that doesn't impact customers, it should be viewed as a time investment to prevent customer-visible delays (and potentially bugs as well) down the road. Developers can sometimes see these benefits more clearly than managers can; if your manager doesn't understand the disadvantages of neglecting maintainability, you might want to grab several other developers and have a chat with your manager.
I think there is a fair case to make for technical debt refactoring where the effort/cost impact of maintaining the code is as high as, or higher even, than the cost of refactoring it to improve quality or work better / properly - specifically to lend it a higher degree of maintainability.
eg: if the software is so problematic you are losing customers, or money, you'd act fast to fix it.. Some might argue this is a business requirement of it's own, but it's often not placed front and centre on small to mid sized development projects, which instead focus on the technicalities of creating apps rather than the impact of the quality of the app on the bottom line.
I think you are probably talking about large scale refactoring rather than the continuous refactoring you would do whilst in the whole red-green-refactor cycle.
My approach would be something like this, if reafactoring an old feature makes it easier to add a new feature then go ahead and do it. But in some ways you are right, if there is no pressure on a particular unit to change (i.e. it is completely finished and will never change again and will never impact on other modules) then there is no practical need to refactor. However I rarely find a module that is quite so finalised.
If everything in Scrum is all about functional things that a user can see (...)
Any project and methodology should be about generating business value, you rarely do things just for the fun in a business environment. Having that said, I see quality in Scrum (and other Agile methods) as a way to not kill your velocity on the long run and, ultimately to achieve hyper productivity. I thus believe that a typical "Definition of Done" should include something like "no increase of technical debt" (put your quality standards in there). If you think a new feature will impact existing code that should be refactored, include this cost in the estimate (or create a refactoring item in your Product Backlog) and explain things to your Product Owner. Because at the end, it's up to the Product Owner to prioritize items and to decide if quality can be sacrificed temporarily (if your business die because you don't release a feature, what is the point of refactoring existing code?). But he must be aware that this can't be a long term strategy or he will kill the team velocity.
bta: Regardless of whether a project uses Scrum or not, many project managers do not like developers spending time on "unnecessary" things like code refactoring or restructuring that doesn't directly advance one of the outstanding functional requirements.
Definitely a noteworthy observation; my solution to this would be as follows:
Perform regular code reviews. Every code review should recommend actions to improve on deficiencies in the code.
There is now a requirement for jobs which improve code quality. Build these into the sprint and track them in the same way as any other job.
If your manager needs any more convincing, cast 'the maintainer' as a user, and describe some user stories for them - and then 'features' are things like 'the code is fully commented with xml doc comments' and 'the code does not produce any warnings from ReSharper'
If you can justify it as part of the process of completing other tasks by identifying issues/risks with current sets of code, and it is a better end result, go for it. But don't get overzealous and screw the timelines/budget.

What are some key concepts for effective development teams? [closed]

Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 6 years ago.
Improve this question
Where I work we've recently put together what we call the Development Standards Committee which is tasked with improving our procedures, processes, methodologies, tools, standards, and whatever we think would help us become a more effective team.
We've got a spreadsheet of items that we've ranked and are going to start tackling from the top down. We've got things such as better source control (currently on SourceSafe), implement a bug tracker (such as Mantis of FogBugz), peer code review, move to .Net 3.5, possibly move to some form of Agile, do more actual team development rather than single developer per project type stuff, and some other things...
What do you think are some key things that can make or break a development team? What should we add to this list?
Some additional information: We have about 12 people on our windows team, and about fifty in development if you include all platforms. We want to improve as much as possible for everyone, but we're our biggest focus is the Windows team. All of us have been here for a couple of years at least, so most of us know each other and work together pretty well.
The number of people on your team is actually really important here. There are basic things that every team should implement (source code control, bug tracking, etc), but there are things that are different base don team size. Code reviews on a very small team, for instance, can be more informal.
Moving to Agile is a good idea, unless you're particular development environment makes it a bad idea. Also, you'll not be able to do this without support from the people who are using your software.
Consider doing things to ensure that communication between the team is easier and with less roadblocks - do all your members know each other pretty well? Can you work with each other? Do you understand each other's idiosyncracies? Learning to work as a team is much more important than any random process improvements you can make.
Require comments when you check in code (it's great if you can tie commits back to your bug tracker)
Maybe Static Code analysis, like what's built into Visual Studio
Continuous Integration like CruiseControl
Development teams really need good people to start with, that work well together, but this isn't really an item to add to the list. It does however affect my first recommendation, be pragmatic. If you're not encouraging your developers to think about how they work and can drive them selves to improve, it's really hard to lay down a development environment that will do it for them.
Mentor and Training: If you can't do XP, then at least hook up your Juniors with Seniors whenever you can. Not only will you share knowledge but you'll share the context around your projects you own.
Some sort of Continous Integration and regular, tested, working "releases" make wonders for quality.
as better source control (currently on SourceSafe)
If this is Visual SourceSafe -- you need to change this immediately. Try cvs, svn or even something paid like Perforce.
There exists something called Rational Unified Process that deals with your problem (and much more).

Can Scrum and Lean principles ruins the life of professionals? [closed]

Closed. This question is off-topic. It is not currently accepting answers.
Want to improve this question? Update the question so it's on-topic for Stack Overflow.
Closed 9 years ago.
Improve this question
I work with scrum about 2 months and don’t have all the experience I wish, so I would like to hear some inputs about it.
My concern is people never say about drawbacks for the two sides; company and workers.
I know the benefits of a cross-functional team but which are the drawbacks? What is hidden beside the amazing Eden Garden?
I'm confused because as a company benefits of replaceable people, for the team is good because the opportunity of having knowledge and share experience (besides all teamwork benefit).
Again, I know all the benefits but I want explore the drawbacks just because in the middle there are the ordinary people.
Normally these people dedicate heavily to gain knowledge. They buy books, courses, attending seminar and so on.
In every company when someone knows much more than everyone else, people and managers get desperate wishing or even demanding that these ordinary people share all their knowledge.
And that’s strange.. Because these are communism thoughts and we live in capitalism society and since I was born, everything was so competed and now people say about collaborative.
Can Scrum and Lean principles ruins (or making hard) the professionals' life?
Scrum and Lean, in and of themselves, cannot ruin anybody's life. Nor can they, alone, make your life.
The culture of your organization will always be a far more dominant factor than the particular product management or development management method in place. Scrum can be misused. Lean can indeed make workers feel replaceable and pressured to perform all day, all the time.
On the other hand, both tools (they are just tools) can be used to create high-performing teams where all members value each other and each others' contributions. Being on a team that delivers consistently good results at high velocity feels great.
You will also find every result in between. It depends much more on culture than process.
I believe that culture flows from the top. Therefore, look at how the company leaders treat each other, their subordinates, their vendors, and their customers. That will tell you much more about what your life will be like than which methodology the company follows.
I'm only going to address your comments about sharing knowledge reducing your own value. In an ideal team culture, knowledge itself isn't as valued as someone's ability to acquire new knowledge and solve problems they haven't seen before. When I think about the star engineers I have known, it's not because they know this or that, it's because it's obvious they could be on nearly any task, on nearly any team and they would both begin to solve the problem and raise the level of the entire team.
There are a few things I've seen from agile methodologies which I'd put against it when you're weighing it up.
From a developers perspective there are two things:
1) The short sprints often lead to short term decisions - which is as intended but can be frustrating for some developers. While delivering "just enough" is great for the project, asking a developer to do something that they know that they're going to have to very heavily refactor, if not rewrite, two sprints down the line can be demotivating.
2) Where you've got opinionated developers (and is there any other sort) I've seen conflict over prioritisation. Adding not only what should be done but how important it is and therefore when it should be done brings on a whole other level of disagreement. In theory the developers don't have a say here but hard delination never works.
From a management point of view they don't like the uncertainty. "When's it going to be ready?" "No idea, when we get to the point you say you're happy". Essentially for them it's a leap of faith - if they do it once then generally they're sold but getting them to do the first time is hard.
I will assume, that as one commentator suggested, you meant to ask: "What are the drawbacks of Scrum?"
I think that the biggest problem with Scrum is that it is easy to understand - but very difficult to implement properly. Scrum, like XP, like most methodologies is not built on individual atomic practices, each capable of improving an existing process.
Scrum requires a shift in the organizational mindset. It requires a shift from ego-centric to communal behavior. The entire organization should focus on bringing the most value, constantly, and do so over perceived self-interest.
For example, a cross-functional team member may be required to do things out of his comfort zone (the flip-side of being able to experiment with new interesting tasks), because it needs to be done by somebody.
Team Leaders and project managers need to relinquish authority when they are called to take on the role of servant-leaders, and when they are asked to stop telling team-members which tasks to pick, instead relying on the team to manage itself.
Stakeholders are forced to face the reality that they can't eat the cake, and have it whole, when they are forced to choose between having all of the scope they want or having it by the date they want it done (this is always true, but Scrum is really in-your-face about it).
Most of all, the drawback of Scrum, is its tendency to disillusion beginning practitioners. This comes from people expecting something from it that it can't deliver: A solution to their problems!
That's right! Scrum does not solve an organizations problems. It highlights them. It is up to the organization to step up to the bat and do something about them. Incidentally, this is done with what I consider to be the single most important ceremony of Scrum - The Retrospective! If you do nothing else in Scrum - do the retrospective:
Find out what you did well, and continue doing it.
Find out what you need to improve and do something to improve it.
Rinse and repeat!
In a presentation by Ken Schwaber to Google on Scrum, he once said that Scrum isn't necessarily good for the organization. It could tell you early on that your project is doomed to fail. If you avoid Scrum, you may have a few more months of ignorant bliss to prepare you for the day you lose your job. Funny, but true. Think on that.
Hope it helps,
Assaf.
I'm no expert in any particular methodology (Agile, Scrum, etc.) but I empathize with your feelings. One of the biggest issues I've seen is that a team that really isn't interested almost unanimously in the methodology will tend to have problems. A few outliers isn't a problem, but if 1/3 or more of the team isn't interested, it becomes a nightmare. Writing good software is important and a company should hire professionals that help them meet that goal, but if the team is forced to meet that objective without finding the experience rewarding the quality will soon drop off.
No, I don't think it will ruin your professional life, but it can be pretty miserable if a company is pig-headed and doesn't realize that they need an environment where their workers are finding rewarding work.
I'm not totally sure of the question because it was kind of hard to follow.
Basically... no? I fail to see how an agile principle could 'ruin a professionals' life'... if implemented incorrectly it could waste some of their time, meaning a small lack of experience gained. Other than that, if the methodology fits the business and is implemented correctly, then is is a powerful tool that is useful to everybody.
Any methodology only works if the people are competent.
Silly question imo.
I've certainly seen things packaged as Scrum and Lean make the development process more difficult. Usually the result of managers picking and choosing the aspects that support their purpose, without buying in to the underlying spirit. Any process can work if properly applied, and process can fail if applied poorly.
Cross-functionality isn't a means to make people replaceable. It's a means to solve flow bottleneck problems that decrease productivity.
Cross-functionality doesn't mean that everyone can do everyone else's job, it means that people are capable of assisting with the work step that come (immediately) before their work or (immediately) after their work.
A better term for this is "Local Generalization", or "Special Generalization". And again, the goal has nothing to do with making people more removable from the organization. Creating the kid of people who can use Local Generalization to their advantage costs a lot of money in teaching and guidance. Once an organization makes such an investment in a worker, they're even less motivated to remove them. And organizations tend to only make such investments in people that they already want to keep around.

Scrum - How to get better input from the functional/commercial team [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
We are a small team of 3 developers (2 experienced but new to this particular business sector) developing a functionally complex product. We're using Scrum and have a demo at the end of each sprint. Its clear that the functional team have plenty of ideas but these are not well communicated to the development team and the demo poses more questions than answers.
Have you any recommendations for improving the the quality of input from the functional people?
Further info: I think part of the problem is that there are no specs or User Stories as such. Personally I think they need to be writing down some sort of requirements - what sort of things should they be writing down and to what complexity given its an agile process?
Have you tried working with your customer to define / formulate acceptance tests?
Using something like Fit to come up with these tests - would result in better specs as well as force the customer to think about what is really required. The icing on the cake is instant-doc-executable specs at the end of this process.
That is of course, if your customers are available and open to this approach. Give it a try!
If not (and that seems to be the majority - because it is less work) - calendar flash 'em - schedule meetings/telecons every week until they sing like canaries :) +1 to Dana
Sometimes the easiest way to get input from people is to force it out of them. My company used SCRUM on a project, and found very quickly that people tend to keep to themselves when they already know what they're doing. We ended up organizing weekly meetings where team members were required to display something that was learned during the week. It was forced, but it worked pretty well.
I'm a big believer in Use Cases, detailing the system behaviour in response to user actions. Collectively these can form a loose set of requirements, and in a SCRUM environment can help you prioritise the Use Cases which will form that particular sprint's implemented features.
For example, after talking to your functional team you identify 15 separate Use Cases. You prioritise the Use Cases, and decided to plan for 5 sprints. And the end of each sprint you go through and demo the product fulfilling the Use Cases implemented during the sprint, noting the feedback and amending the Use Cases.
I understand that the people you call functional people are acting as Product Owners, right?
I think part of the problem is that there are no specs or User Stories as such. Personally I think they need to be writing down some sort of requirements - what sort of things should they be writing down and to what complexity given its an agile process?
Actually, without having any specs you probably have no acceptance test for the backlog itens as well. You should ask the PO to write the user stories, I like the "As a - type of user -, I want -some goal- so that -some reason-." form. Keep in mind that the User Stories shall be INVEST - Independent, Negotiable, Valuable to users or customers, Estimable, Small and Testable. What is a must is to have the Acceptance tests written together with the story so that the team should know what the story must be able to do in order do be set as done.
Remember that as the product evolves, it's expected to the PO have ideas as he sees the working product. It's not a bad thing, actually it is one of the best thing you can get through Agile. What you have to pay attention is that this ideas mus be included in the product backlog and it needs to be prioritized by th PO. And, if it's necessary and will add value to the customer, the idea should be planned to be built in the next sprint.
Someone from the functional team should be part of the team and available to answer your questions about the features you're adding.
How can you estimate the Backlog item if they are not detailled enough ?
You could establissh a rule that Backlog item that do not have clear acceptance criteria cannot be planned.
If would be better to have someone from the functional team acting as Product Owner, to determine, choose and priotitize the Backlog items, and/or as Domain Expert.
Also, make sure everyone in both the functional team and the development team speaks the same language, so as to avoid misunderstandings ; See ubiquitous language.
Track the time most waiting for answers from the functional team as well as he time wasted developping unnecessary features or reworking existing features so that they fits the bill.
Are they participating in the stand-up meetings?
You could propose to have a representative at each (or some) of them, to ask them for input before the end of the sprint
Are you doing stand-up meetings and do you have burn down chart? I think those two areas would benefit you greatly.
I recommend the book "Practices of an agile developer" it is full of suggestions how to make a scrum team successful. It also gives good tips how to get the product owner/customer more involved and how to get the whole process rolling. It's worth the money IMHO.
I agree that you need some sort of requirements (user stories or else).
One piece of advice I can give is to use some sort of visual aids with the functional teams. When customers have plenty of ideas (as you've said) they usually also have a visual idea of what a feature looks like, when the developed product doesn't fit this visual idea it creates a lot of doubts, even if it does the job functionally.
When discussing functionality with customers, I try to be very visual. Drawing sketches on a board, or even verbally describing what something would look like. Trying to find a common visual image. You can then take a photo of the sketches and use them as part of the documentation.
Another advice is to keep your sprints as short as possible, so that you do more frequent demos. But you may already be doing this, since you didn't mention your current sprint duration.