Create dashboard views that are based off of current date (ie. show resource overview for next 2 months) - ms-project

I'm attempting to create a report that is based off the current date. So, for example, creating a line graph that shows total work for all resources for the next 2 months. It would be very similar to the resource overview dashboard, but it wouldn't be pulling in data from the entire project.
The 'Resource Usage' view below has been very helpful, as it would be visual aids based on the hour allocations below.
We can create a graph like the one below in the reporting module, I would like the graph to only look at the next 2 months (instead of the entire project duration).
The goal is to look at capacity and future work allocation to easily look at resource availability to aid in assigning future tasks.
Thoughts? Tips? Advice?

You should be able to use the built-in Report capability in MS Project 2016. Try modifying the Progress Versus Cost chart in the Cost Overview report.

Related

How to create a dynamic report in ignition s perspective

I’m trying to create a report at the end of the day for 1 product that has a range of 40-100 pieces per day. Here’s my issue:
How can I pass a start date and time and a end date and time parameter to a report that has 1 graph and 1 table. The graph is data coming in from a sensor per piece of product and a table displaying the details for that run. There could be 40-100 pieces ran and I need to query a ms sql server to report on these pieces all in one report. Is there a way to do this? I know if repeater components, but idk if that’s possible in a report. I think the easiest way is to use scripting to query and create tables and graphs on the fly and add them to the report but I haven’t found an example of how to implement that. Any help is appreciated.
I’ve tried nested queries and nested tables to display a graph in the header and have details for every piece of product but the problem is the data for the graph isn’t the same as the data for the details

How to assign "fixed work" task to multiple resources taking vacations into account

Let's say you have a small project. The team has estimated all the tasks as 300 days of effort.
I have 5 developers in the team, and I want MS Project to tell me when the project will complete considering vacations and working schedule of my team member.
In order to do that:
I'm creating a Task "Development" with fixed work "300d", and task type "Fixed Work".
Then I create 5 resources, and specify a 2 week vacation for one of the developers somewhere in the middle of the schedule.
Then I assign my 5 development resources to this task.
The problem is, the 300d distributed evenly to all 5 development resources. And If one of them have a two weeks vacation in between, due to that particular resource the work will be finished 2 weeks later, where other 4 resources are sitting and doing nothing for 2 weeks. Total duration is 70 days.
what I get
What I want to get is: work is distributed accordingly through all 5 resources unevenly in a way that the whole task finishes as earlier as possible taking most of the usable time from all developers.
That's how I would expect it to work. In that particular case I was distributing hours manually.
what i would expect
Is there a possibility in MS Project to do something like this? Or am I doing something wrong?
There are a couple issues with how you are approaching the problem.
1. Rather than just planning out the manpower hours estimated to be needed for the entire project on a single line item, You should plan out the tasks that will need to be done to accomplish "Small Project"
If you discretely plan out the tasks that need to be accomplished to satisfy the scope of "Small project", you can establish dependency (predecessor/successor) relationships between your tasks and figure out what tasks need to be done before you can move on to others. When you do this it will give you a good idea of how long the total duration of the project will take and likely be more accurate than just relying on an estimate based on the manpower hours estimate your developers give you. Find out what tasks they actually need to do, not just how many hours they think the whole project will take them. This will also allow you to plan out the utilization of your resources better because you'll be able to assign specific resources to specific tasks, and not all of your resources need to be on every task.
2. In general I would avoid using the Task Usage form.
I noticed you are altering resources in the task usage form, but unless you are really experienced with Microsoft Project I would avoid ever touching that, as it's really easy to set the period of performance of resources assigned to a task to be different than the actual period of performance of the task itself. This will cause MS Project to behave unusually, and it can be hard for an unexperienced user to understand why. This usually leads to pain and frustration. This leads me to my next bit of advice:
3. If you really want to specify a resource's vacation time, it's better to adjust the calendar associated the resource to exclude those dates as working dates.
In your situation with only 5 resources on your project, this can be fairly easy to do. You can accomplish this 2 different ways (I'll start with the easiest option):
1. You can add resource specific exclusion dates to the default calendar in your project
You can accomplish this by opening the Resource Sheet table and then clicking the Project tab then Change Working Times. If you have the Resource Sheet open instead of the Gantt chart, you can specify the resource that is going to be effected by the exceptions:
In this example you can see that I would be excluding (removing) 8/23/21 thru 9/3/21 as working days for the SW Engineer resource, without needing to change the calendar used by the resource completely.
2. You can completely change the calendar used by particular resources to be different than the default calendar set for the project.
You can accomplish this by going into the Resource Sheet and opening the Base Calendar column:
From here you can assign any calendar that exists in the project to the resource. Of course this means you would need to create the calendars and assign exclusion dates to them.
To create a calendar, click the Project tab then click Change Working Times. Click Create New Calendar on the form that opens up and give it a name:
From there you can add exclusion dates and all that.
Note: In a larger project with many resources, I would recommend not messing with the calendar for the resources at all. It just gets hard to deal with when there are a lot of resources.

Tracking a Search that leads to a sale in GA

This seems really basic but i am struggling with it
We have a client who runs a travel website.
They have a few different search bars eg Flights, Hotels, Carhire.
I am trying to track the performance of each... "What % of people completed a sale that ran a Flight search." Same for Hotel, and for Car hire
Any ideas for the best way to get this info in GA?
Many thanks
There are a few ways to get this information, each with their pros and cons. The options that I see immediately available are segments and goals.
Segments are great because they are retrospective and generally more flexible, with the ability to be changed if you find your criteria isn't quite right. You create here, and specify sessions that go through search results pages etc:
Then you can create another segment for booking confirmation page, and any other intermediary steps that you'd like to report on. The main con of segments is that you can only pull in 4 at a time, but if you have more you can pull them 4 at a time and copy+paste the data into an excel sheet or google sheet. Segments can also be pulled via the Core Reporting Api and DataStudio which makes them great for automating into dashboards.
Goals are cool because they pull into the default reports, and basically track sessions through a particular page, event or sequence. The main con I see and the reason is that I don't use them is that they only start tracking fro mthe time you create them , and if you change the configuration it does not impact historical data, so your data can get messed up quickly if you don't have sandbox GA views or sandbox goals for your testing before putting it into a dedicated goal slot. You can also only have 10 or 20 goals depending on your plan, so once data is tracked against that goal you can't remove or clear it.

Calculate % based on Total Events for Event Action in Google data studio

I just started to use Google Data Studio for creating a dashboard to get more insights in our data. Now I've created the table you can see below.
This is the data from the trackers on our video's. The first event action videotrackerStart is the total amount of people who started watching the video. What I want to do is calculate what percentage the rest of the event actions is from the videotrackerStart event.
So for example (176,985 / 222,468) * 100 = 79.5% and that for each action.
The problem I face, is that I don't know how to (if it is even possible) save the Total Events for videotrackerStart in a variable and use that value to create a new metric.
Does anyone know how I could get this done? I hope the question is clear, please let me know if not.
Thanks in advance!
Edit (2017/10/26): Percentage of total is now supported in Data Studio using Analytics Functions.
Original: Percentage of total for a metric is not yet supported in tables in Data Studio. You can Request this feature or vote for the feature in the existing feature request list.
To represent the same information visually you can try using barcharts.

How can we generate Reports using flex bulider?

is it possiable we can bulid the reports using flex bulider ? or can we and any
frameworks for build the reports ? .
i don't know what way to bulid the reports
flex bulider have any build reports compoents there?
i want sorting reports order like
By Product Company Name Expected Close Month
Consultant Expected Revenue
this is are fields
Product 1 A May’10 X £1,000.00
B Jun’10 Y £2,000.00 C Jul’10
X £3,000.00 Sub Total
£6,000.00
Product 2 etc
Grand Total £24,000.00
This is are data . How is it possiable ?
Could u give any gudiends me ?
Answer based on first revision.
Typically applications would give this responsibility to the server. Your Flex application passes parameters to the server with a request for a PDF document and the server puts together the appropriate one and seconds it back.
If you're using AIR to run your Flex application you could probably write a library to create a PDF file and then same it to the user's computer but I would stress that the kind of libraries you would need for your server already exist. For example: http://php.net/pdf
Report tends to be a rather generic term and as the other responder indicated that it meant PDF to him/her. The application I am working on is very report heavy. We have a requirement for a client side report ("Think Report in Flex") and PDF version of the same report.
When we originally looked 1yr back, there is no Report library that provides the equivalent of what lifecycle does on the server. Therefore we have had to build our own and it is based on a generic template mechanism.
So can it be done. Yes. But I would recommend developing a generic means to render your reports and it is not a easy task if you want to keep it generic so you can create multiple type of reports.
Also, avoid the trap of nesting your reports through VBOX, HBOX and containers to provide a flexible layout system as it will not perform well.

Resources