I use fullcalendar v2.7.3. I want to show the left time grid on the top and the day grid at left which show on the top Please refer the screenshot.
Related
**Background:**I am creating a custom daterange picker component in React and want it to open right by default and open left if width on right hand side is not sufficient for complete two-month window to show?
**Question:**Is there a way in CSS/SASS/JS to determine remaining width and put a logic based on that?
Happy to provide more info, if needed. Please help.
**Current scenario:**Currently I have hardcoded it open right on certain screens and left on others. But would need a more cleaner, generic approach.
Additional info: The container of calendar has calendar plus some other info-based component arranged using CSS grid.
is there are way to fix the day display on left of day view in fullcalendar?
We group by name at the top and a horizontal scrollbar, when scrolling to the right the time scrolls with. is there a way to fix the times on the left side and scroll
Full calendar day view
I want the header in Fullcalendar weeek view to be shown as selected for Today date. How can this be achieved?
I want the blue border to be present from top of Tuesday 21. I am able to achieve from the bottom of the cell but the same needs to shown from top.
Is it possible in fullcalendar to align some event box to the bottom instead of the default normal top align in the month view?
The idea is to have some events aligned up and others aligned down. (Important events up, less important events down (even in the same day)).
Thanx in Advance...
Attorn
The way I would handle it is to make sure that you have your two event sources in the order that you want them to display. AKA. Google 1 then Google 2....
Then I would assign a className: object to the top source and add a css margin-bottom:15px to the className that you gave the source. This will separate the two sources as I think the goal is to do.
I am creating a scheduling application that displays when projects throughout a semester occur. Currently, when the application starts up, the user is shown todays date as the first date, and then the next 13 days follows it. In order to view past or future projects, the user is able to click a button or select a date from a calendar feature. Once one of these buttons is selected, or a date from the calendar is selected, I have a function to actually shift the x value of each and every project over by a certain number of days (the difference in days between the first date currently being displayed, and the newly selected first date). Depending on how many projects are in the semester, this method can be quite timely (upwards of 5-8 seconds).
What I would like to do is this: have the horizontal scroll bar on the bottom of the screen and allow the user to simply scroll to any date of their choosing. Currently, this is what my wrapper canvas declaration looks like:
<mx:Canvas id="mainWrapper" width="100%" height="100%" y="119" verticalScrollPolicy="on" horizontalScrollPolicy="off">
If i set the horizontalScrollPolicy to "on" then I'm given no scroll bar because the canvas width is set to 100% of the screens viewing area. If I set the width to be the width needed to enclose all of the projects than the user will most likely not be able to see the scroll bar.
So my question is this. Is there a way, I can have the width of the canvas be much much larger than my screen's width, and still have the horizontal scroll bar only be the width of the screen? I've made a picture to help illustrate what I'm trying to say (since I'm not always the most clear while explaining myself)